[1] |
周安平,杨明,赵斌,等. 电力系统运行调度中的高阶不确定性及其对策评述[J]. 电力系统自动化, 2018, 42(12): 173-183. ZHOU Anping, YANG Ming, ZHAO Bin, et al. High-order uncertainty and corresponding strategies of operation and dispatching for power sysytem[J]. Automation of Electreic Power systems, 2018, 42(12): 173-183.
|
[2] |
RUIZ P A, PHILBRICK C R, ZAK E, et al. Uncertainty management in the unit commitment problem[J]. IEEE Transactions on Power Systems, 2009, 24(2): 642-651.
|
[3] |
FU Yong, SHAHIDEHPOUR M, LI Zuyi. Security-constrained unit commitment with AC constraints[J]. IEEE Transactions on Power Systems, 2005, 20(2): 1001-1013.
|
[4] |
WANG Jianhui, SHAHIDEHPOUR M, LI Zuyi. Security-constrained unit commitment with volatile wind power generation[J]. IEEE Transactions on Power Systems, 2008, 23(3): 1319-1327.
|
[5] |
MORALES-ESPAA G, BALDICK R, GARCIA-GONZALEZ J, et al. Power-capacity and ramp-capability reserves for wind integration in power-based UC[J]. IEEE Transactions on Sustainable Energy, 2017, 7(2): 1-11.
|
[6] |
LUO Fengji, MENG Ke, DONG Zhaoyang, et al. Coordinated operational planning for wind farm with battery energy storage system[J]. IEEE Transactions on Sustainable Energy, 2020, 6(1): 253-262.
|
[7] |
ZHANG Bei, KEZUNOVIC M. Impact on power system flexibility by electric vehicle participation in ramp market[J]. IEEE Transactions on Smart Grid, 2016, 7(3): 1285-1294.
|
[8] |
KIRAN B, KUMARI M S. Demand response and pumped hydro storage scheduling for balancing wind power uncertainties: a probabilistic unit commitment approach[J]. International Journal of Electrical Power & Energy Systems, 2016, 81: 114-122.
|
[9] |
KOUWENBERG R. Scenario generation and stochastic programming models for asset liability management[J]. European Journal of Operational Research, 2001, 134(2): 279-292.
|
[10] |
MORALEZ J M, CONEJO A J, PEREZ-RUIZ J. Economic valuation of reserves in power systems with high penetration of wind power[J]. IEEE Transactions on Power Systems, 2009, 24(2):900-910.
|
[11] |
BERTSIMAS D, SIM M. The price of robustness[J]. Operations Research, 2004, 52(1): 35-53.
|
[12] |
GUAN Yongpei, WANG Jianhui. Uncertainty sets for robust unit commitment[J]. IEEE Transactions on Power Systems, 2014, 29(3): 1439-1440.
|
[13] |
王士柏, 韩学山, 杨明, 等. 计及不确定性的等备用边际效用约束的电力系统经济调度[J]. 中国电机工程学报, 2015, 35(5): 1143-1152. WANG Shibo, HAN Xueshan, YANG Ming, et al. Economic dispatch of power system including equal marginal reserve utility contraint considering uncertainties[J]. Proceedings of the CSEE, 2015, 35(5): 1143-1152.
|
[14] |
刘国静, 韩学山, 王尚, 等. 基于强化学习方法的风储合作决策[J]. 电网技术, 2016, 40(9): 2729-2736. LIU Guojing, HAN Xueshan, WANG Shang, et al. Optimal decision-making in the cooperation of wind power and energy storage based on reinforcement learning algorithm[J]. Power System Technology, 2016, 40(9): 2729-2736.
|
[15] |
王成福, 王昭卿, 孙宏斌, 等. 考虑预测误差时序分布特性的含风电机组组合模型[J]. 中国电机工程学报, 2016, 36(15): 4081-4089. WANG Chengfu, WANG Zhaoqing, SUN Hongbin, et al. Model of unit commitment with wind farm considering time series characteristic of wind power forecast error[J]. Proceedings of the CSEE, 2016, 36(15): 4081-4089.
|
[16] |
盛四清, 孙晓霞. 利用风蓄联合削峰的电力系统经济调度[J]. 电网技术, 2014, 38(9): 2484-2489. SHENG Siqing, SUN Xiaoxia. An economic dispatching strategy of peak load shifting by wind farm and pumped storage plant[J]. Power System Technology, 2014, 38(9): 2484-2489.
|
[17] |
谢毓广, 江晓东. 储能系统对含风电的机组组合问题影响分析[J]. 电力系统自动化, 2011, 35(5): 19-24. XIE Yuguang, CHIANG Hsiaodong. Impact of energy storage system on the unit commitment problem with volatile wind power[J]. Automation of Electreic Power systems, 2011, 35(5): 19-24.
|
[18] |
黄杨, 胡伟, 闵勇, 等. 计及风险备用的大规模风储联合系统广域协调调度[J]. 电力系统自动化, 2014, 38(9): 41-47. HUANG Yang, HU Wei, MIN Yong, et al. Risk-constrained coordinative dispatching for large-scale wind-storage system[J]. Automation of Electreic Power systems, 2014, 38(9): 41-47.
|
[19] |
王士柏, 韩学山, 杨明. 计及机组备用响应能力的电力系统区间经济调度[J]. 中国电机工程学报, 2013, 33(7): 99-108. WANG Shibo, HAN Xueshan, YANG Ming. Interval economic dispatch of power system considering unit reserve responsiveness[J]. Proceedings of the CSEE, 2013, 33(7): 99-108.
|
[20] |
BOUFFARD F, GALIANA F D. Stochastic security for operations planning with significant wind power generation[J]. IEEE Transactions on Power Systems, 2018, 23(2): 306-316.
|
[21] |
雷宇, 杨明, 韩学山. 基于场景分析的含风电系统机组组合的两阶段随机优化[J]. 电力系统保护与控制, 2012, 40(23): 58-67. LEI Yu, YANG Ming, HAN Xueshan. A two-stage stochastic optimization of unit commitment considering wind power based on scenario analysis[J]. Power System Protection and Control, 2012, 40(23): 58-67.
|
[22] |
刘国静, 韩学山, 杨明. 电力系统运行协同的经济调度[J]. 中国电机工程学报, 2014, 34(16): 2668-2675. LIU Guojing, HAN Xueshan, YANG Ming. Synergetic economic dispatch in power system operation[J]. Proceedings of the CSEE, 2014, 34(16): 2668-2675.
|
[23] |
张玉敏, 吉兴全, 于一潇, 等. 一种计及概率风险备用传递的机组组合方法: CN111463808A[P]. 2020-05-21.
|
[24] |
WU Lei. A tighter piecewise linear approximation of quadratic cost curves for unit commitment problems[J]. IEEE Transactions on Power Systems, 2011, 26(4): 2581-2583.
|
[25] |
WANG Cheng, LIU Feng, WANG Jianhui, et al. Risk-based admissibility assessment of wind generation integrated into a bulk power system[J]. IEEE Transactions on Sustainable Energy, 2019, 7(1): 325-336.
|
[26] |
WANG Cheng, LIU Feng, WANG Jianhui, et al. Robust risk-constrained unit commitment with large-scale wind generation: an adjustable uncertainty set approach[J]. IEEE Transactions on Power Systems, 2017, 32(1): 723-733.
|
[27] |
CARRION M, ARROYO J M. A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J]. IEEE Transactions on Power Systems, 2006, 21(3): 1371-1378.
|
[28] |
杨明,程凤璐,韩学山. 电力系统实时调度的有效静态安全域法[J]. 中国电机工程学报, 2015, 35(6): 1353-1362. YANG Ming, CHENG Fenglu, HAN Xueshan. Real-time dispatch based on effective steady-state security regions of power system[J]. Proceedings of the CSEE, 2015, 35(6): 1353-1362.
|