Journal of Shandong University(Engineering Science) ›› 2023, Vol. 53 ›› Issue (2): 143-154.doi: 10.6040/j.issn.1672-3961.0.2023.053

Previous Articles    

A risk-based probability reserve optimization method

PEI Younan1, HAN Xueshan1*, ZHANG Yumin2, YE Pingfeng2, LI Jingrui2   

  1. 1. Key Laboratory of Power System Intelligent Dispatch and Control of Ministry of Education(Shandong University), Jinan 250061, Shandong, China;
    2. College of Electrical Engineering and Automation, Shandong University of Science and Technology, Qingdao 266590, Shandong, China
  • Received:2023-03-16 Online:2023-04-22 Published:2023-04-21

CLC Number: 

  • TM71
[1] 周安平,杨明,赵斌,等. 电力系统运行调度中的高阶不确定性及其对策评述[J]. 电力系统自动化, 2018, 42(12): 173-183. ZHOU Anping, YANG Ming, ZHAO Bin, et al. High-order uncertainty and corresponding strategies of operation and dispatching for power sysytem[J]. Automation of Electreic Power systems, 2018, 42(12): 173-183.
[2] RUIZ P A, PHILBRICK C R, ZAK E, et al. Uncertainty management in the unit commitment problem[J]. IEEE Transactions on Power Systems, 2009, 24(2): 642-651.
[3] FU Yong, SHAHIDEHPOUR M, LI Zuyi. Security-constrained unit commitment with AC constraints[J]. IEEE Transactions on Power Systems, 2005, 20(2): 1001-1013.
[4] WANG Jianhui, SHAHIDEHPOUR M, LI Zuyi. Security-constrained unit commitment with volatile wind power generation[J]. IEEE Transactions on Power Systems, 2008, 23(3): 1319-1327.
[5] MORALES-ESPAA G, BALDICK R, GARCIA-GONZALEZ J, et al. Power-capacity and ramp-capability reserves for wind integration in power-based UC[J]. IEEE Transactions on Sustainable Energy, 2017, 7(2): 1-11.
[6] LUO Fengji, MENG Ke, DONG Zhaoyang, et al. Coordinated operational planning for wind farm with battery energy storage system[J]. IEEE Transactions on Sustainable Energy, 2020, 6(1): 253-262.
[7] ZHANG Bei, KEZUNOVIC M. Impact on power system flexibility by electric vehicle participation in ramp market[J]. IEEE Transactions on Smart Grid, 2016, 7(3): 1285-1294.
[8] KIRAN B, KUMARI M S. Demand response and pumped hydro storage scheduling for balancing wind power uncertainties: a probabilistic unit commitment approach[J]. International Journal of Electrical Power & Energy Systems, 2016, 81: 114-122.
[9] KOUWENBERG R. Scenario generation and stochastic programming models for asset liability management[J]. European Journal of Operational Research, 2001, 134(2): 279-292.
[10] MORALEZ J M, CONEJO A J, PEREZ-RUIZ J. Economic valuation of reserves in power systems with high penetration of wind power[J]. IEEE Transactions on Power Systems, 2009, 24(2):900-910.
[11] BERTSIMAS D, SIM M. The price of robustness[J]. Operations Research, 2004, 52(1): 35-53.
[12] GUAN Yongpei, WANG Jianhui. Uncertainty sets for robust unit commitment[J]. IEEE Transactions on Power Systems, 2014, 29(3): 1439-1440.
[13] 王士柏, 韩学山, 杨明, 等. 计及不确定性的等备用边际效用约束的电力系统经济调度[J]. 中国电机工程学报, 2015, 35(5): 1143-1152. WANG Shibo, HAN Xueshan, YANG Ming, et al. Economic dispatch of power system including equal marginal reserve utility contraint considering uncertainties[J]. Proceedings of the CSEE, 2015, 35(5): 1143-1152.
[14] 刘国静, 韩学山, 王尚, 等. 基于强化学习方法的风储合作决策[J]. 电网技术, 2016, 40(9): 2729-2736. LIU Guojing, HAN Xueshan, WANG Shang, et al. Optimal decision-making in the cooperation of wind power and energy storage based on reinforcement learning algorithm[J]. Power System Technology, 2016, 40(9): 2729-2736.
[15] 王成福, 王昭卿, 孙宏斌, 等. 考虑预测误差时序分布特性的含风电机组组合模型[J]. 中国电机工程学报, 2016, 36(15): 4081-4089. WANG Chengfu, WANG Zhaoqing, SUN Hongbin, et al. Model of unit commitment with wind farm considering time series characteristic of wind power forecast error[J]. Proceedings of the CSEE, 2016, 36(15): 4081-4089.
[16] 盛四清, 孙晓霞. 利用风蓄联合削峰的电力系统经济调度[J]. 电网技术, 2014, 38(9): 2484-2489. SHENG Siqing, SUN Xiaoxia. An economic dispatching strategy of peak load shifting by wind farm and pumped storage plant[J]. Power System Technology, 2014, 38(9): 2484-2489.
[17] 谢毓广, 江晓东. 储能系统对含风电的机组组合问题影响分析[J]. 电力系统自动化, 2011, 35(5): 19-24. XIE Yuguang, CHIANG Hsiaodong. Impact of energy storage system on the unit commitment problem with volatile wind power[J]. Automation of Electreic Power systems, 2011, 35(5): 19-24.
[18] 黄杨, 胡伟, 闵勇, 等. 计及风险备用的大规模风储联合系统广域协调调度[J]. 电力系统自动化, 2014, 38(9): 41-47. HUANG Yang, HU Wei, MIN Yong, et al. Risk-constrained coordinative dispatching for large-scale wind-storage system[J]. Automation of Electreic Power systems, 2014, 38(9): 41-47.
[19] 王士柏, 韩学山, 杨明. 计及机组备用响应能力的电力系统区间经济调度[J]. 中国电机工程学报, 2013, 33(7): 99-108. WANG Shibo, HAN Xueshan, YANG Ming. Interval economic dispatch of power system considering unit reserve responsiveness[J]. Proceedings of the CSEE, 2013, 33(7): 99-108.
[20] BOUFFARD F, GALIANA F D. Stochastic security for operations planning with significant wind power generation[J]. IEEE Transactions on Power Systems, 2018, 23(2): 306-316.
[21] 雷宇, 杨明, 韩学山. 基于场景分析的含风电系统机组组合的两阶段随机优化[J]. 电力系统保护与控制, 2012, 40(23): 58-67. LEI Yu, YANG Ming, HAN Xueshan. A two-stage stochastic optimization of unit commitment considering wind power based on scenario analysis[J]. Power System Protection and Control, 2012, 40(23): 58-67.
[22] 刘国静, 韩学山, 杨明. 电力系统运行协同的经济调度[J]. 中国电机工程学报, 2014, 34(16): 2668-2675. LIU Guojing, HAN Xueshan, YANG Ming. Synergetic economic dispatch in power system operation[J]. Proceedings of the CSEE, 2014, 34(16): 2668-2675.
[23] 张玉敏, 吉兴全, 于一潇, 等. 一种计及概率风险备用传递的机组组合方法: CN111463808A[P]. 2020-05-21.
[24] WU Lei. A tighter piecewise linear approximation of quadratic cost curves for unit commitment problems[J]. IEEE Transactions on Power Systems, 2011, 26(4): 2581-2583.
[25] WANG Cheng, LIU Feng, WANG Jianhui, et al. Risk-based admissibility assessment of wind generation integrated into a bulk power system[J]. IEEE Transactions on Sustainable Energy, 2019, 7(1): 325-336.
[26] WANG Cheng, LIU Feng, WANG Jianhui, et al. Robust risk-constrained unit commitment with large-scale wind generation: an adjustable uncertainty set approach[J]. IEEE Transactions on Power Systems, 2017, 32(1): 723-733.
[27] CARRION M, ARROYO J M. A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J]. IEEE Transactions on Power Systems, 2006, 21(3): 1371-1378.
[28] 杨明,程凤璐,韩学山. 电力系统实时调度的有效静态安全域法[J]. 中国电机工程学报, 2015, 35(6): 1353-1362. YANG Ming, CHENG Fenglu, HAN Xueshan. Real-time dispatch based on effective steady-state security regions of power system[J]. Proceedings of the CSEE, 2015, 35(6): 1353-1362.
[1] Hengxu ZHANG,Zhimin GAO,Yongji CAO,Hao QIN,Dong YANG,Huan MA. Review and prospect of research on power system inertia with high penetration of renewable energy source [J]. Journal of Shandong University(Engineering Science), 2022, 52(5): 1-13.
[2] SUN Donglei, JIAN Qingzhi, LI Zhiqi, HAN Xueshan, WANG Mingqiang, CHEN Bo, FU Yimu. Power system uniformity planning based on source network coordination [J]. Journal of Shandong University(Engineering Science), 2022, 52(5): 92-101.
[3] Wensheng LI,Xian WANG,Yuanze MI,Yongji CAO,Xiaoming LIU,Hengxu ZHANG,Zihan LIU. Method for generation planning with the temporal and spatial correlation of wind and solar power [J]. Journal of Shandong University(Engineering Science), 2022, 52(1): 111-119, 127.
[4] Xueshan HAN,Xinyi WANG,Ming YANG,Yixiao YU. Review and prospect of renewable energy ramp events [J]. Journal of Shandong University(Engineering Science), 2021, 51(5): 53-62.
[5] Xiaoyan QI,Hengjie LIU,Qiuhua HOU,Xiaoyu LIU,Yanchao TAN,Liancheng WANG. Short-term load forecasting of iron and steel industry area based on combination model of SVM and LSTM [J]. Journal of Shandong University(Engineering Science), 2021, 51(4): 91-98.
[6] Xiaoming LIU,Yini CONG,Wenbo LI,Yutian LIU. Comprehensive decision-making method for large-scale photovoltaic system integrated to receiving-end power grid [J]. Journal of Shandong University(Engineering Science), 2019, 49(4): 115-122.
[7] Meng LIU,Taoyang XU,Changgang LI,Yue WU,Zhi WANG,Fangfang SHI,Jianjun SU,Guohui ZHANG,Kuan LI. Optimization of emergency load shedding of receiving-end power grid based on Particle Swarm Optimization [J]. Journal of Shandong University(Engineering Science), 2019, 49(1): 120-128.
[8] LI Sun, WANG Chao, ZHANG Guilin, XU Zhigen, CHENG Tao, WANG Yiyuan, WANG Ruiqi. Short-term power load forecasting based on support vector regression [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(6): 52-56.
[9] CONG Yini, CAO Zenggong, MU Hong, WANG Chunyi, LIU Yutian. Scheme analysis on GW-scale coastal mud flat PV system connected to power grid [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(6): 77-82.
[10] ZHAO Kang, WANG Chunyi, YANG Dong, LIU Yutian. Short circuit current limiting optimization of ultra-high voltage receiving-end power grid [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2016, 46(4): 117-124.
[11] JI Xingquan, HAN Guozheng, LI Kejun, FU Rongrong, ZHU Yanghe. Application of improved K-means clustering algorithm based on density in distribution network block partitioning [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2016, 46(4): 41-46.
[12] YU Songqing, HOU Chenghao, SUN Yingtao. Power demand forecasting in Shandong province with system dynamics [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2015, 45(6): 91-98.
[13] WANG Ming. Fault line selection method of distribution network based on the relative change rate in dominant bands [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2015, 45(4): 25-30.
[14] GAO Hong-Xia, XU Meng-Ming, LI Ge-Jun, TAN Shen-Yu. A new detecting method for the voltage sag source in a distribution system [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(5): 115-119.
[15] LI Li,LIU Yu-tian . Out-of-step splitting scheme based on coherency identification and self-adaptive power system separation criteria [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2007, 37(6): 49-53 .
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] WANG Su-yu,<\sup>,AI Xing<\sup>,ZHAO Jun<\sup>,LI Zuo-li<\sup>,LIU Zeng-wen<\sup> . Milling force prediction model for highspeed end milling 3Cr2Mo steel[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(1): 1 -5 .
[2] ZHANG Yong-hua,WANG An-ling,LIU Fu-ping . The reflected phase angle of low frequent inhomogeneous[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(2): 22 -25 .
[3] LI Kan . Empolder and implement of the embedded weld control system[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(4): 37 -41 .
[4] SHI Lai-shun,WAN Zhong-yi . Synthesis and performance evaluation of a novel betaine-type asphalt emulsifier[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(4): 112 -115 .
[5] KONG Xiang-zhen,LIU Yan-jun,WANG Yong,ZHAO Xiu-hua . Compensation and simulation for the deadband of the pneumatic proportional valve[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(1): 99 -102 .
[6] LAI Xiang . The global domain of attraction for a kind of MKdV equations[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(1): 87 -92 .
[7] YU Jia yuan1, TIAN Jin ting1, ZHU Qiang zhong2. Computational intelligence and its application in psychology[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 1 -5 .
[8] LI Liang, LUO Qiming, CHEN Enhong. Graph-based ranking model for object-level search
[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 15 -21 .
[9] CHEN Rui, LI Hongwei, TIAN Jing. The relationship between the number of magnetic poles and the bearing capacity of radial magnetic bearing[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2018, 48(2): 81 -85 .
[10] WANG Bo,WANG Ning-sheng . Automatic generation and combinatory optimization of disassembly sequence for mechanical-electric assembly[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(2): 52 -57 .