1 |
LINDENMEYER D , DOMMEL H W , ADIBI M M . Power system restoration—a bibliographical survey[J]. International Journal of Electrical Power & Energy Systems, 2001, 23 (3): 219- 227.
|
2 |
LIU Y , FAN R , TERZIJA V . Power system restoration: a literature review from 2006 to 2016[J]. Journal of Modern Power Systems & Clean Energy, 2016, 3 (4): 332- 341.
|
3 |
杨挺, 赵黎媛, 王成山. 人工智能在电力系统及综合能源系统中的应用综述[J]. 电力系统自动化, 2019, 43 (1): 2- 14.
|
|
YANG Ting , ZHAO Liyuan , WANG Chengshan . Review on application of artificial intellgence in power system and integrated energy system[J]. Automation of Electric Power Systems, 2019, 43 (1): 2- 14.
|
4 |
LIU Y , SUN P , WANG C . Group decision support system for backbone-network reconfiguration[J]. International Journal of Electrical Power & Energy Systems, 2015, 71, 391- 402.
|
5 |
薛禹胜, 肖世杰. 综合防御高风险的小概率事件:对日本相继天灾引发大停电及核泄漏事件的思考[J]. 电力系统自动化, 2011, 35 (8): 1- 11.
|
|
XUE Yusheng , XIAO Shijie . Comprehensively defending high risk events with low probability[J]. Automation of Electric Power Systems, 2011, 35 (8): 1- 11.
|
6 |
汤涌, 卜广全, 易俊. 印度"7.30"、"7.31"大停电事故分析及启示[J]. 中国电机工程学报, 2012, 32 (25): 167- 174.
|
|
TANG Yong , BU Guangquan , YI Jun . Analysis and lessons of the blackout in Indian power grid on July 30 and 31, 2012[J]. Proceedings of the CSEE, 2012, 32 (25): 167- 174.
|
7 |
易俊, 卜广全, 郭强, 等. 巴西"3·21"大停电事故分析及对中国电网的启示[J]. 电力系统自动化, 2019, 43 (2): 1- 9.
|
|
YI Jun , BU Guangquan , GUO Qiang , et al. Analysis on blackout in Brazilian power grid on march 21, 2018 and its enlightenment to power grid in China[J]. Automation of Electric Power Systems, 2019, 43 (2): 1- 9.
|
8 |
SUN W , LIU C , ZHANG L . Optimal generator start-up strategy for bulk power system restoration[J]. IEEE Transactions on Power Systems, 2011, 26 (3): 1357- 1366.
|
9 |
刘玉田, 王洪涛, 叶华. 电力系统恢复理论与技术[M]. 北京: 科学出版社, 2014.
|
10 |
SAKAGUCHI T , MATSUMOTO K . Development of a knowledge based system for power system restoration[J]. IEEE Transactions on Power Apparatus and Systems, 1983, 102 (2): 320- 329.
|
11 |
ZENG S , LIN Z , WEN F , et al. A new approach for power system black-start decision-making with vague set theory[J]. International Journal of Electrical Power & Energy Systems, 2012, 34 (1): 114- 120.
|
12 |
朱海南, 刘玉田. 考虑线路投入顺序的网架重构机组恢复多目标优化[J]. 电力系统自动化, 2014, 38 (16): 53- 59.
|
|
ZHU Hainan , LIU Yutian . Multi-objective optimization of unit restoration during network reconstruction considering line restoration sequence[J]. Automation of Electric Power Systems, 2014, 38 (16): 53- 59.
|
13 |
SILVER D , HUANG A , Maddison C J , et al. Mastering the game of go with deep neural networks and tree search[J]. Nature, 2016, 529 (7587): 484- 489.
|
14 |
LIU W , LIN Z , WEN F , et al. A wide area monitoring system based load restoration method[J]. IEEE Transactions on Power Systems, 2013, 28 (2): 2025- 2034.
|
15 |
SARMADI S A N , DOBAKHSHARI A S , AZIZI S , et al. A sectionalizing method in power system restoration based on WAMS[J]. IEEE Transactions on Smart Grid, 2011, 2 (1): 190- 197.
|
16 |
SUN R , LIU Y , WANG L . An online generator start-up algorithm for transmission system self-healing based on MCTS and sparse autoencoder[J]. IEEE Transactions on Power Systems, 2019, 34 (3): 2061- 2070.
|
17 |
KOJIMA Y , WARASHINA S , NAKAMURA S , et al. Development of a guidance method for power system restoraiton[J]. IEEE Transactions on Power Systems, 1989, 4 (3): 1219- 1227.
|
18 |
KIRSCHEN D S , VOLKMANN T L . Guiding a power-system restoration with an expert system[J]. IEEE Transactions on Power Systems, 1991, 6 (2): 558- 566.
|
19 |
周云海, 胡翔勇, 罗斌. 基于案例推理的大停电恢复系统设计[J]. 电力系统自动化, 2007, 32 (18): 87- 90.
|
|
ZHOU Yuhai , HU Xiangyong , LUO Bin . Design of a case based reasoning system for power system restoration[J]. Automation of Electric Power Systems, 2007, 32 (18): 87- 90.
|
20 |
王洪涛, 刘玉田, 邱夕兆. 基于分层案例推理的黑启动决策支持系统[J]. 电力系统自动化, 2004, 28 (11): 49- 52.
|
|
WANG Hongtao , LIU Yutian , QIU Xizhao . Hierarchical case-based reasoning decision-making system for power system balck start[J]. Automation of Electric Power Systems, 2004, 28 (11): 49- 52.
|
21 |
刘玉田, 王春义. 基于数据仓库的网架恢复群体智能决策支持系统[J]. 电力系统自动化, 2009, 33 (1): 45- 50.
|
|
LIU Yutian , WANG Chunyi . A group intellgent decision support system for power system seleton restoration based on data warehouse[J]. Automation of Electric Power Systems, 2009, 33 (1): 45- 50.
|
22 |
张志毅, 陈允平. 基于模糊多属性决策的黑启动方案优选[J]. 高电压技术, 2007, 33 (3): 42- 45.
|
|
ZHANG Zhiyi , CHEN Yunping . Optimization of power system black-start schemes based on the fuzzy multiple attribute decision-making method[J]. High Voltage Engineering, 2007, 33 (3): 42- 45.
|
23 |
LIU W , LIN Z , WEN F , et al. Analysis and optimisation of the preferences of decision-makers in black-start group decision-making[J]. IET Generation Transmission & Distribution, 2013, 7 (1): 14- 23.
|
24 |
钟慧荣, 顾雪平. 基于模糊层次分析法的黑启动方案评估及灵敏度分析[J]. 电力系统自动化, 2010, 34 (16): 34- 37.
|
|
ZHONG Huirong , GU Xueping . Assessment of power system black-start schemes based on fuzzy analytic hierarchy process and its sensitivity analysis[J]. Automation of Electric Power Systems, 2010, 34 (16): 34- 37.
|
25 |
SUN P , LIU Y , QIU X , et al. Hybrid multiple attribute group decision-making for power system restoration[J]. Expert Systems with Applications, 2015, 42 (19): 6795- 6805.
|
26 |
刘艳, 王涛, 王文炎. 用于网架重构方案运行风险评估的线路投运模型[J]. 中国电机工程学报, 2014, 34 (7): 1124- 1131.
|
|
LIU Yan , WANG Tao , WANG Wenyan . Model of restoring transmission lines for operational risk assessment of network-reconfiguration scheme[J]. Proceedings of the CSEE, 2014, 34 (7): 1124- 1131.
|
27 |
张雪丽, 梁海平, 朱涛, 等. 基于模糊机会约束规划的电力系统网架重构优化[J]. 电力系统自动化, 2015, 39 (14): 68- 74.
|
|
ZHANG Xueli , LIANG Haiping , ZHU Tao , et al. Optimization of power netowrk reconfiguraiton based on fuzzy chance constrained programming[J]. Automation of Electric Power Systems, 2015, 39 (14): 68- 74.
|
28 |
陈彬, 王洪涛, 曹曦. 计及负荷模糊不确定性的网架重构后期负荷恢复优化[J]. 电力系统自动化, 2016, 40 (20): 6- 12.
|
|
CHEN Bin , WANG Hongtao , CAO Xi . Load restoration optimization during the last stage of network reconfiguration considering load fuzzy uncertainty[J]. Automation of Electric Power Systems, 2016, 40 (20): 6- 12.
|
29 |
蔺呈倩, 王洪涛, 赵瑾, 等. 基于可信性理论的含直流落点系统风电与负荷协调恢复优化[J]. 电网技术, 2019, 43 (2): 410- 417.
|
|
LIN Chengqian , WANG Hongtao , ZHAO Jin , et al. Wind power-load coordinated restoration optimization of power system with DC terminal location based on credibility theory[J]. Power System Technology, 2019, 43 (2): 410- 417.
|
30 |
HOU Y , LIU C , SUN K , et al. Computation of milestones for decision support during system restoration[J]. IEEE Transactions on Power Systems, 2011, 26 (3): 1399- 1409.
|
31 |
CHOU Y , LIU C , WANG Y , et al. Development of a black start decision supporting system for isolated power systems[J]. IEEE Transactions on Power Systems, 2013, 28 (3): 2202- 2210.
|
32 |
陈彬, 王洪涛. 电力系统恢复过程中的工频过电压动态优化控制[J]. 电力系统自动化, 2015, 39 (14): 54- 59.
|
|
CHEN Bin , WANG Hongtao . Dynamic optimal control of sustained overvoltage during power system restoration[J]. Automation of Electric Power Systems, 2015, 39 (14): 54- 59.
|
33 |
LIU Y , GU X . Skeleton-network reconfiguration based on topological characteristics of scale-free networks and discrete particle swarm optimization[J]. IEEE Transactions on Power Systems, 2007, 22 (3): 1267- 1274.
|
34 |
王江宇, 刘艳. 基于重构方案线路投运风险最小的机组恢复顺序优化[J]. 电力系统保护与控制, 2016, 44 (11): 68- 75.
|
|
WANG Jiangyu , LIU Yan . Optimization of unit′s restoration sequence based on minimizing of lines′ restoration risk corresponding to reconfiguration scheme[J]. Power System Protection and Control, 2016, 44 (11): 68- 75.
|
35 |
王洪涛, 刘玉田. 基于NSGA-Ⅱ的多目标输电网架最优重构[J]. 电力系统自动化, 2009, 33 (23): 14- 18.
|
|
WANG Hongtao , LIU Yutian . Multi-objective optimization of power system reconsturuction based on NSGA-Ⅱ[J]. Automation of Electric Power Systems, 2009, 33 (23): 14- 18.
|
36 |
陈亮, 顾雪平, 贾京华. 基于病毒进化改进NSGA-Ⅱ算法的扩展黑启动多目标优化[J]. 电力系统保护与控制, 2014, 42 (2): 35- 42.
|
|
CHEN Liang , GU Xueping , JIA Jinghua . Multi-objective extended black-start schemes optimization based on virus evolution improved NSGA-Ⅱ algorithm[J]. Power System Protection and Control, 2014, 42 (2): 35- 42.
|
37 |
SUN L , WANG X , LIU W , et al. Optimisation model for power system restoration with support from electric vehicles employing battery swapping[J]. IET Generation Transmission & Distribution, 2016, 10 (3): 771- 779.
|
38 |
顾雪平, 刘文轩, 王佳裕, 等. 一种机组恢复决策的多时段协调优化方法[J]. 电工技术学报, 2016, 31 (21): 114- 124.
|
|
GU Xueping , LIU Wenxuan , WANG Jiayu , et al. An optimization approach based on multiple time-step coordination for decision making of unit restoration[J]. Transactions of China Electrotechnical Society, 2016, 31 (21): 114- 124.
|
39 |
SUN R, ZHU H, LIU Y. A r-NSGA-Ⅱ algorithm based generator start-up for network reconfiguration[C]//5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Changsha, China: IEEE, 2015: 1332-1335.
|
40 |
谢彦祥, 刘天琪, 苏学能. Hadoop架构下基于分布式粒子群算法的骨架网络重构方法[J]. 电网技术, 2018, 42 (3): 886- 893.
|
|
XIE Yanxiang , LIU Tianqi , SU Xueneng . A novel skeleton network reconfiguraiton method based on distributed PSO algorithm and hadoop architecture[J]. Power System Technology, 2018, 42 (3): 886- 893.
|
41 |
瞿寒冰, 刘玉田. 网架重构后期的负荷恢复优化[J]. 电力系统自动化, 2011, 35 (19): 43- 48.
|
|
QU Hanbin , LIU Yutian . Load restoration optimization during last stage of network reconfiguration[J]. Automation of Electric Power Systems, 2011, 35 (19): 43- 48.
|
42 |
刘文轩, 顾雪平, 王佳裕, 等. 考虑系统安全因素的负荷恢复方案优化[J]. 电力系统自动化, 2016, 40 (12): 87- 93.
|
|
LIU Wenxuan , GU Xueping , WANG Jiayu , et al. Optimization of load recovery scheme considering system security factors[J]. Automation of Electric Power Systems, 2016, 40 (12): 87- 93.
|
43 |
顾雪平, 赵宝斌, 刘文轩. 结合多目标优化与灰色关联决策的负荷恢复方法[J]. 电力自动化设备, 2015, 35 (9): 6- 13.
|
|
GU Xueping , ZHAO Baobin , LIU Wenxuan . Load restoration based on multi-objective optimization and grey incidence decision-making[J]. Electric Power Automation Equipment, 2015, 35 (9): 6- 13.
|
44 |
李膨源, 顾雪平. 基于神经网络的黑启动操作过电压快速预测[J]. 电网技术, 2006, 30 (3): 66- 70.
|
|
LI Pengyuan , GU Xueping . Fast determination of switching overvoltage in black start process based on artificial neural netowrks[J]. Power System Technology, 2006, 30 (3): 66- 70.
|
45 |
THUKARAM D , KHINCHA H P , KHANDELWAL S . Estimation of switching transient peak overvoltages during transmission line energization using artificial neural network[J]. Electric Power Systems Research, 2006, 76 (4): 259- 269.
|
46 |
TAHER S A , SADEGHKHANI I . Estimation of magnitude and time duration of temporary overvoltages using ANN in transmission lines during power system restoration[J]. Simulation Modelling Practice and Theory, 2010, 18 (6): 787- 805.
|
47 |
SADEGHKHANI I , KETABI A , FEUILLET R . Radial basis function neural network application to power system restoration studies[J]. Computational Intelligence and Neuroscience, 2012, (654895): 1- 10.
|
48 |
BRETAS A S , PHADKE A G . Artificial neural networks in power system restoration[J]. IEEE Transactions on Power Delivery, 2003, 18 (4): 1181- 1186.
|
49 |
YE D , ZHANG M , SUTANTO D . A hybrid multiagent framework with Q-Learning for power grid systems restoration[J]. IEEE Transactions on Power Systems, 2011, 26 (4): 2434- 2441.
|
50 |
SILVER D , SCHRITTWIESER J , SIMONYAN K , et al. Mastering the game of Go without human knowledge[J]. Nature, 2017, 550 (7676): 354- 359.
|
51 |
程乐峰, 余涛, 张孝顺, 等. 机器学习在能源与电力系统领域的应用和展望[J]. 电力系统自动化, 2019, 43 (1): 15- 43.
|
|
CHENG Lefeng , YU Tao , ZHANG Xiaoshun , et al. Machine learning for energy and electric power systems:state of the art and prospects[J]. Automation of Electric Power Systems, 2019, 43 (1): 15- 43.
|
52 |
YU X , XUE Y . Smart grids: a cyber-physical systems perspective[J]. Proceedings of the IEEE, 2016, 104 (SI): 1058- 1070.
|
53 |
田世明, 栾文鹏, 张东霞, 等. 能源互联网技术形态与关键技术[J]. 中国电机工程学报, 2015, 35 (14): 3482- 3494.
|
|
TIAN Shiming , LUAN Wenpeng , ZHANG Dongxia , et al. Technical forms and key technologies on energy internet[J]. Proceedings of the CSEE, 2015, 35 (14): 3482- 3494.
|
54 |
王毅, 陈启鑫, 张宁, 等. 5G通信与泛在电力物联网的融合:应用分析与研究展望[J]. 电网技术, 2019, 43 (5): 1575- 1585.
|
|
WANG Yi , CHEN Qixin , ZHANG Ning , et al. Fusion of the 5G Communication and the ubiquitous electric internet of things: application analysis and research prospects[J]. Power System Technology, 2019, 43 (5): 1575- 1585.
|