JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE) ›› 2010, Vol. 40 ›› Issue (5): 12-16.
• Articles • Previous Articles Next Articles
LI Jin-zhong1, XIA Jie-wu1, ZENG Jin-tao1, WANG Xiang2*
[1] | PEI Xiaobing, CHEN Huifen, ZHANG Baizhan, CHEN Menghui. Improved bi-variables estimation of distribution algorithms for multi-objective permutation flow shop scheduling problem [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(4): 25-30. |
[2] | DENG Guanlong, YANG Hongyong, ZHANG Shuning, GU Xingsheng. Multi-objective scheduling in no-wait flow shop using a hybridized differential evolution algorithm [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2016, 46(5): 21-28. |
[3] | ZHANG Fei, GENG Hong-qin. Optimization of job-shop scheduling problem based on chaos particle swarm optimization algorithm [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(3): 19-22. |
[4] | ZHANG Qi-cong1, YANG Gong-ping2*. Study on Agent based simulation of banking queuing system [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2011, 41(4): 68-72. |
[5] | LI Ming, LI Qi-qiang, GUO Qing-qiang, DING Ran. Scheduling optimization model of refinery processes based on production characteristics [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2010, 40(3): 51-56. |
[6] | YU Da-yang1, MENG Xiang-xing2, HAN Xue-shan1, ZHAO Jian-guo3. The solution space structure and searching strategies of the integrated-maintenance scheduling problem [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2010, 40(2): 130-132. |
[7] | JIA Mao-Sen, GUO Qiang-Jiang, ZHANG Bin. Algorithm for generalized disjunctive programming model of production scheduling [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(6): 53-57. |
[8] | WU Yin-gui,YUAN Dong-feng,LIU Jian . Packet scheduling algorithm based on a contention window for IEEE 802.11 WLAN [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2007, 37(6): 62-65 . |
[9] | CHEN Xin,YANG Wen-dong,LU Xun,ZHU Jin-fu . An ant colony algorithm for an aircraft sequencing problem in the airport terminal area [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2007, 37(6): 111-117 . |
|