JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE) ›› 2017, Vol. 47 ›› Issue (3): 102-111.doi: 10.6040/j.issn.1672-3961.0.2016.276
Previous Articles Next Articles
LIU Jifeng1, YANG Huanhuan2
CLC Number:
[1] LEE W F, ISHIHARA K. Forensic diagnosis of a shield tunnel failure[J].Engineering Structure, 2010(32):1830-1837. [2] LIAO S M, LIU J M,WANG R L, et al. Shield tunneling and environment protection in Shanghai soft ground [J].Tunnelling and Underground Space Technology, 2009(24):454-465. [3] 张成平,张顶立,王梦恕,等.城市隧道施工诱发的地面塌陷灾变机制及其控制[J].岩土力学,2010,31(Z1):303-309. ZHANG Chengping, ZHANG Dingli, WANG Mengshu, et al. Catastrophe mechanism and control technology of ground collapse induced by urban tunnelling[J].Rock and Soil Mechanics, 2010, 31(Z1):303-309. [4] 张在明, 韩煊. 城市隧道施工引起建筑物变形的损坏评估[J].土木工程学报,2011,44(5): 123-130. ZHANG Zaiming, HAN Xuan. Assessment of damage of deformed buildings induced by urban tunneling[J].China Civil Engineering Journal, 2011, 44(5):123-130. [5] 贺美德,刘军,乐贵平,等. 盾构隧道近距离侧穿高层建筑的影响研究[J].岩石力学与工程学报,2010,29(3):603-608. HE Meide, LIU Jun, LE Guiping, et al. Study of impact of shield tunnelling side-crossing on adjacent high buildings[J].Chinese Journal of Rock Mechanics and Engineering, 2010, 29(3):603-608. [6] 魏钢,裘新谷,魏新江, 等.邻近建筑物的暗挖隧道施工数值模拟[J]. 岩土力学,2009,20(2):547-552. WEI Gang, QIU Xingu, WEI Xinjiang, et al. Numerical simulation of underground excavated tunnel construction of adjacent structure[J]. Rock and Soil Mechanics, 2009, 20(2):547-552. [7] PARK K H. Analytical solution for tunnelling-induced ground movement in clays[J]. Tunnelling and Underground Space Technology, 2005(20):249-261. [8] CHI S Y, CHERN J C, LIN C C. Optimized back-analysis for tunnelling-induced ground movement using equivalent ground loss model[J]. Tunnelling and Underground Space Technology, 2001(16):159-165. [9] 薛翊国,李术才,张庆松,等.隧道信息化施工地质灾害预警预报技术研究[J].山东大学学报(工学版),2008,38(5):25-30. XUE Yiguo, LI Shucai, ZHANG Qingsong, et al. Prediction and early-warning technology of geological hazards in tunnel informational construction[J].Journal of Shandong University(Engineering Science), 2008, 38(5):25-30. [10] 刘钦,李术才,李利平,等.软弱破碎围岩隧道大变形施工力学行为及支护对策研究[J].山东大学学报(工学版),2011, 41(3):118-125. LIU Qin, LI Shucai, LI Liping, et al. Study of large deformation construction mechanical behavior and support measures of soft rock in a deep buried extra long trunnel[J].Journal of Shandong University(Engineering Science), 2011, 41(3):118-125. [11] 刘波,曹波,刘芳,等.北京地铁暗挖隧道变形监测与稳定性数值分析[J].地下空间与工程学报,2011,7(3):518-525,540. LIU Bo, CAO Bo, LIU Fang, et al. Deformation monitoring and numerical analysis of stability for metro construction with mining method in Beijing[J].Chinese Journal of Underground Space and Engineering, 2011, 7(3):518-525,540. [12] 孙克国,仇文革,王中平,等.高速公路改扩建工程对高铁隧道的近接施工影响[J].山东大学学报(工学版),2015, 45(5):70-76. SUN Keguo, QIU Wenge, WANG Zhongping, et al. Study on approaching excavation influence between expanding projects of expressway and high speed railway tunnel under operation state[J].Journal of Shandong University(Engineering Science), 2008, 38(5):25-30. [13] 李涛,刘波,朱连华,等.双线盾构顺序下穿铁路箱涵的实例研究[J].太原理工大学学报,2013,44(3):373-377. LI Tao, LIU Bo, ZHU Lianhua, et al. Case study on the twin shield tunnelling sequence construction undercrossing the railway box culvert[J]. Journal of Taiyuan University of Technology, 2013, 44(3):373-377. [14] 刘纪峰, 张会芝. 盾构隧道旁穿建筑物地层沉降的数值模拟分析[J].建筑科学,2011,27(9):31-36. LIU Jifeng, ZHANG Huizhi. Numerical simulation for the ground settlement caused by shield tunnel under through buildings[J]. Building Science, 2011, 27(9):31-36. [15] 衡朝阳,滕延京,陈希泉.地铁盾构隧道周边建筑物地基基础变形控制研究[J].地下空间与工程学报,2006,2(8):1336-1340. HENG Chaoyang, TENG Yanjing, CHEN Xiquan. Research of allowable deformation value of the building foundation soils above metro shield tunnel[J].Chinese Journal of Underground Space and Engineering, 2006, 2(8):1336-1340. [16] LIU B, Han Y. A FLAC3D-based subway tunneling-induced ground settlement prediction system developed in China[C] // Proceedings of the 4th FLAC International Symposium. Madrid, Spain: Publisher AA Balkema, 2006:55-61. [17] MROUEH H,SHAROUR I. A full 3-D finite element analysis of tunnelling-adjacent structures interaction[J]. Computers and Geotechnics, 2003(30):245-253. [18] 刘纪峰,陈福星,张会芝.双线暗挖隧道沿线建筑物墙体开裂分析[J].河南科技大学学报(自然科学版),2015,36(3):59-64. LIU Jifeng, CHEN Fuxing, ZHANG Huizhi. Wall cracking analysis of building near double line excavated tunnel[J].Journal of Henan University of Science and Technology(Natural Science), 2015, 36(3):59-64. [19] 杨建康.北京地铁十号线超近长距离平行盾构隧道施工[J].施工技术,2010,39(3):59-62. YANG Jiankang. Construction of super-close and long-distance parall shield tunnel in Beijing metro line 10[J].Construction Technology, 2010, 39(3):59-62. [20] 刘纪峰,崔秀琴,刘波. 考虑水-土耦合的盾构隧道地表沉降试验研究[J].中国铁道科学,2009,30(6):38-45. LIU Jifeng, CUI Xiuqin, LIU Bo. Experimental study on the shield tunnelling-induced surface settlement considering water-soil coupling[J].China Railway Science, 2009, 30(6):38-45. [21] 潘光明,郑东柱.隧道深部围岩薄弱区定域控制注浆技术及应用[J].山东大学学报(工学版),2016,46(1):49-55+6. PAN Guangming, ZHENG Dongzhu. Grouting technology and application of the orientation grouting in weak area of surrounding rock tunneling[J].Journal of Shandong University(Engineering Science), 2016, 46(1):49-55+6. [22] NIKBAKHTAN B, OSANLOO M. Effect of grout pressure and grout flow on soil physical and mechanical properties in jet grouting operations[J]. International Journal of Rock Mechanics & Mining Sciences, 2009, 46(3):498-505. |
[1] | WANG Gang1, 2, JIANG Yu-jing2, LI Shucai3. Rapid feedback analysis method for underground caverns during constructing [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2011, 41(4): 133-136. |
[2] | ZHOU Hai-ying1, LI Li-xin2, CHEN Ting-guo1. Experiments and calculation method for bearing capacity of the lining segment of metro shield tunneling [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2010, 40(4): 84-87. |
|