JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE) ›› 2009, Vol. 39 ›› Issue (4): 78-81.

• Articles • Previous Articles     Next Articles

Advanced geological prediction of filled caverns and  control of geological disasters

  

  1. The 4th Engineering Co., LTD. of China Railway Shisiju Group, Jinan250003, China
  • Received:2009-06-01 Online:2009-08-24 Published:2009-08-24

Abstract:

Unknown geological disasters, such as water inrush and mud gushing, are often triggered by disclosing filling cavities in the constructions of karst developing tunnels. Advanced geological prediction methods, drilling boreholes surveying and TSP were adopted for the prediction of filling cavities. And a former designed supporting program was adjusted and optimized according to the prediction conclusions. Other advanced supporting measures were also taken to support the dangerous districts, such as advanced curtain grouting, small-pipe grouting and pipe-shed grouting. In addition,  pile-cap-bridges were in troduced to handle the filling cavities under the tunnel. By this method,  geological disasters were prevented, and  construction loss was reduced, so that the construction safety of the tunnel was guaranteed.

Key words: advanced geological prediction; filled cavern; controlling method of geological disasters

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!