JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE) ›› 2009, Vol. 39 ›› Issue (4): 45-49.

• Articles • Previous Articles     Next Articles

Studies on combined blasting method of the TSP advanced  geological prediction

  

  1. Geotechnical and Structural Engineering Research Center, Shandong University, Jinan 250061, China
  • Received:2009-05-20 Online:2009-08-24 Published:2009-08-24

Abstract:

In order to simultaneously get long distance and better precision of tunnel seismic prediction(TSP), the combined blasting method was adopted to ameliorate trigger modes of seismic signals in the TSP advanced geological preeiction. The empirical formula of the center distance between the trigger boreholes was brought forward.In addition, when the time delay errors of instantaneous detonators were  controlled under several micro-seconds or even several tenths of one micro second, and the measuring instrument was introduced to measure the  time delay error, the errors of seismic travel time information and geological predictions could be reduced. By means of the combined blasting method, seismic waves with the characteristic of both highenergy and high frequency, as well as long distance and better precision of predictions could be obtained at the same time. This method was successfully applied at the Yunwushan tunnel of the Yiwan Railway, and the Qiyueshan Tunnel and the Longtan tunnel of the Hu-Rongxi Expressway.

Key words: combined blasting, tunnel seismic prediction(TSP), seismic wave, advanced geological prediction, time delay error

[1] ZHOU Lun, LI Shucai, XU Zhenhao, LI Liping, HUANG Xin, HE Shujiang, LI Guohao. Integrated advanced geological prediction technology of tunnel and its engineering application [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(2): 55-62.
[2] LI Zhi-peng, ZHANG Qing-song*, LI Shu-cai, XUE Yi-guo, SU Mao-xin, DING Zhi-hai, ZHANG Wei-jie. The application of TEM geological forecast about the F1-2 water-bearing  fault of the Kiaochow Bay subsea tunnel [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2011, 41(1): 101-104.
[3] ZHANG Xiao, LI Shu-Cai, ZHANG Qiang-Song, LIU Qin, ZHANG Ning, LIU Bin. Research in  field tests  of the influence factors of the TSP system signal collection quality [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(4): 25-29.
[4] ZHAOYan, LI Shu-Cai, XUE Yi-Guo, LI Wei-Teng, DING Zhi-Hai. The application of TSP203 advanced geological predication about  f2-1 watery fault of the Jiaozhouwan subsea tunnel [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(4): 40-44.
[5] YUAN Xiao-Shuai, ZHANG Qing-Song, XU Zhen-Hao, GAO Yang. Abnormal seismic signals in the TSP advanced geological prediction [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(4): 53-56.
[6] ZHANG Guang-Xian. Advanced geological prediction of filled caverns and  control of geological disasters [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(4): 78-81.
[7] ZHANG Qing-Song, HU Zhen-Hao, LI Shu-Cai. Integrated advanced geological prediction methods and engineering application of karst tunnels [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(4): 7-11.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!