Journal of Shandong University(Engineering Science) ›› 2024, Vol. 54 ›› Issue (1): 131-140.doi: 10.6040/j.issn.1672-3961.0.2022.309

• Civil Engineering • Previous Articles    

Analysis of the bearing capacity of the elliptical deep tunnel under the action of the anchor rod reinforcement

HAO Yanguang1, XU Jiansheng2, MING Daogui1, LEI Ting1, QIU Mingxi1, CHEN Diyang3*   

  1. 1. Construction Technology Company, Wuhan 430050, Hubei, China;
    2. Shandong University of Science and Technology, Qingdao 266590, Shangdong, China;
    3. Shandong University(Qihe)New Materials and Intelligent Equipment Research Institute, Dezhou 251100, Shandong, China
  • Published:2024-02-01

CLC Number: 

  • O319.56
[1] 余涛,方勇,姚志刚,等. 隧道预应力锚杆锚固结构承载效应及围岩力学分析[J]. 岩土工程学报,2022,44(6):1-10. YU Tao, FANG Yong, YAO Zhigang, et al. Bearing effect and surrounding rock mechanical analysis of tunnel prestressed anchor anchor structure[J]. Geotechnical Journal, 2022, 44(6):1-10.
[2] 石宗涛.济南黄河隧道泥水盾构开挖面稳定性分析[J].隧道与地下工程灾害防治,2022,4(4):71-77. SHI Zongtao. Stability analysis of slurry shield excavation face of Jinan Yellow River Tunnel[J]. Hazard Control in Tunnelling and Underground Engineering, 2022, 4(4): 71-77.
[3] 孟强,赵洪波,茹忠亮,等. 锚杆支护圆形隧洞弹塑性解[J]. 工程力学, 2015, 32(7): 17-25. MENG Qiang, ZHAO Hongbo, RU Zhongliang, et al. The bar support round tunnel elastic plastic solution[J]. Engineering Mechanics, 2015, 32(7):17-25.
[4] 王庆瀚,赵继增,田宁. 硬岩地层大断面暗挖车站主动支护设计及其接口段施工技术[J].隧道与地下工程灾害防治,2021,3(2): 86-96. WANG Qinghan, ZHAO Jizeng, TIAN Ning. Active support design and interface section construction technology of large section underground excavation station in hard rock stratum[J]. Hazard Control in Tunnelling and Underground Engineering, 2021, 3(2): 86-96.
[5] KNIGHT R. Stress functions for a plate containing groups of circular holes[J]. Philosophical Transactions of the Royal Society of London, 1939, 238(793):357-392.
[6] 陈子荫. 围岩力学分析中的解析方法[M]. 北京:煤炭工业出版社, 1994.
[7] 吕爱钟,张路青. 地下隧洞力学分析的复变函数方法[M]. 北京:科学出版社, 2007.
[8] 吕爱钟, 祝二浩. 确定椭圆形隧洞端头锚固锚杆轴力的解析方法[J]. 岩石力学与工程学报, 2019, 38(6):1117-1128. LÜ Aizhong, ZHU Erhao. Analytic method for determining the axial force of the anchor rod at the end of the elliptic tunnel[J]. Journal of Rock mechanics and Engineering, 2019, 38(6):1117-1128.
[9] 饶军应,傅鹤林,刘运思,等. 管状填充性椭圆形溶洞的围岩应力弹性解析分析[J]. 中南大学学报(自然科学版), 2015, 46(7):2605-2612. RAO Junying, FU Helin, LIU Yunsi, et al. Elelastic analysis of surrounding rock stress in tubular filled oval cave[J]. Journal of Central South University(Natural Science Edition), 2015, 46(7): 2605-2612.
[10] 傅鹤林,张加兵,陈伟,等. 深埋圆形毛洞隧道围岩压力拱范围研究[J]. 湖南大学学报(自然科学版), 2018, 45(7):117-124. FU Helin, ZHANG Jiabing, CHEN Wei, et al. Study on surrounding rock pressure arch range of deep buried round wool hole tunnel[J]. Journal of Hunan University(Natural Science Edition), 2018, 45(7):117-124.
[11] 祝江鸿. 隧洞围岩应力复变函数分析法中的解析函数求解[J]. 应用数学和力学, 2013, 34(4): 345-354. ZHU Jianghong. Analytic function solution in analysis of tunnel rock stress complex function[J]. Applied Mathematics and Mechanics, 2013, 34(4): 345-354.
[12] 郭佳奇,乔春生. 椭圆孔口塑性区及其在岩溶隧道工程中的应用[J]. 铁道学报, 2013, 35(3): 108-114. GUO Jiaqi, QIAO Chunsheng. Oliptic orifice plastic zone and its application in karst tunnel engineering[J]. Journal of Railways, 2013, 35(3): 108-114.
[13] 徐芝纶. 弹性力学简明教程[M]. 北京:高等教育出版社, 2013.
[14] 朱大勇,钱七虎,周早生,等. 复杂形状洞室映射函数的新解法[J]. 岩石力学与工程学报, 1999, 18(3):279-282. ZHU Dayong, QIAN Qihu, ZHOU Zaosheng, et al. New solution to the complex shape hole chamber mapping function[J]. Journal of Rock mechanics and Engineering, 1999, 18(3): 279-282.
[15] 刘淑红,范金录,朱永全. 非圆形隧道毛洞围岩的应力和塑性区[J]. 中国铁道科学,2022,43(3):78-85. LIU Shuhong, FAN Jinlu, ZHU Yongquan. Stress and plastic zone in surrounding rock of noncircular tunnel[J]. China Railway Science, 2022, 43(3): 78-85.
[16] 李元辉,刘明飞,李坤蒙,等. 矩形采场支护作用下围岩周边应力复变函数解析解[J].金属矿山,2021,538(4):20-26. LI Yuanhui, LIU Mingfei, LI Kunmeng, et al. Analytical solution of complex variable function of surrounding rock stress under rectangular stope support[J]. Metal Mine, 2021, 538(4): 20-26.
[17] 王志强,武超,石磊,等. 基于复变理论的双向不等压圆形巷道围岩应力及塑性区分析[J]. 煤炭学报,2019,44(增刊2):419-429. WANG Zhiqiang, WU Chao, SHI Lei, et al. Analysis of stress and plastic zone in surrounding rock of two-way unequal pressure circular roadway based on complex variable theory[J]. Coal Journal, 2019, 44(Suppl.2): 419-429.
[18] 赵国彦,刘立顺,董陇军,等.端锚预应力锚杆作用范围研究及其应用[J].湖南科技大学学报(自然科学版),2010,25(1):1-7. ZHAO Guoyan, LIU Lishun, DONG Longjun, et al. Study on action range of end-anchored prestressed anchor and its application[J]. Journal of Hunan University of Science and Technology(Natural Science Edition), 2010, 25(1): 1-7.
[19] 徐彬,李仲奎. 地下水封石油洞库初始地应力回归分析[J]. 工程地质学报,2018,26(5):1390-1396. XU Bin, LI Zhongkui. Regression analysis of initial geostress of underground water-sealed oil caverns[J]. Journal of Engineering Geology, 2018, 26(5): 1390-1396.
[20] 王章琼,晏鄂川,季惠斌.黄岛地下水封油库地应力场及地质构造作用分析[J].工程地质学报,2016,24(1):136-141. WANG Zhangqiong, YAN Echuan, JI Huibin. Analysis of in-situ stress field and geological structure of Huangdao underground water sealed oil depot[J]. Journal of Engineering Geology, 2016, 24(1): 136-141.
[21] 王章琼,晏鄂川,鲁功达,等. 我国大陆地下水封洞库库址区地应力场分布规律统计分析[J].岩土力学,2014,35(增刊1):251-256. WANG Zhangqiong, YAN Echuan, LU Gongda, et al. Statistical analysis on distribution law of in-situ stress field of underground water-sealed caverns in mainland China[J]. Geotechnical Mechanics, 2014, 35(Suppl.1): 251-256.
[22] 陈祥,孙进忠,张杰坤,等. 黄岛地下水封石油洞库场区地应力场模拟分析[J]. 岩土工程学报,2009,31(5):713-719. CHEN Xiang, SUN Jinzhong, ZHANG Jiekun, et al. Simulation analysis of in-situ stress field in Huangdao underground water-sealed oil cavern[J]. Geotechnical Engineering, 2009, 31(5): 713-719.
[1] SUN Keguo, QIU Wenge, WANG Zhongping, GAO Xiaoyan, GONG Lun, KONG Chao. Study on approaching excavation influence between expanding projects of expressway and high speed railway tunnel under operation state [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 0, (): 70-76.
[2] ZHANG Bo,LI Shu-cai,YANG Xue-ying,WANG Xi-ping,ZHANG Dun-fu . Numerical analysis on the stability of a rocksalt roadbed with two circular cavities [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(1): 66-69 .
[3] SUN Keguo, QIU Wenge, WANG Zhongping, GAO Xiaoyan, GONG Lun, KONG Chao. Study on approaching excavation influence between expanding projects of expressway and high speed railway tunnel under operation state [J]. Journal of Shandong University(Engineering Science), 2015, 45(5): 70-76.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!