山东大学学报(工学版) ›› 2015, Vol. 45 ›› Issue (3): 86-94.doi: 10.6040/j.issn.1672-3961.0.2014.040
• 土木工程 • 上一篇
朱登元1, 姚占勇2, 葛守仁1
ZHU Dengyuan1, YAO Zhanyong2, GE Shouren1
摘要: 为了增加桥下被交道路的通行空间,采取袖阀管劈裂注浆加固柱式桥台台后主动压力区土体及台前被动压力区土体,并在分段分级挖除台前填土过程中增设锚杆钢筋混凝土挡墙的内外部双重加固措施;采用Abaqus6.10非线性分析软件,建立柱式桥台前坡加固改造的三维弹塑性模型,模拟分析柱式桥台前坡全断面一次挖除、分段分级挖除两种方案的开挖过程和路基边坡稳定性,确定了路基加固范围;现场监控开挖过程中的墙顶位移和锚杆拉力,分析了土体开挖、挡墙施工过程中的稳定性。研究结果表明:全断面分级开挖支挡方案的稳定安全系数为1.61,路基边坡分段分级开挖支挡方案的稳定安全系数为1.84,分段分级方案更加安全;墙顶位移主要发生在施工期,其间锚杆拉力没有发生突变,挡墙及墙后土体安全稳定;台前与台后劈裂注浆加固,有效提高了加固区土体的抗剪强度和抗变形能力,开挖过程中无坍塌、掉落、滑移等现象。
中图分类号:
[1] 张肇伸.锚定板挡土结构的有限单元分析[J].岩土工程学报,1983,5(2):22-34. ZHANG Zhaoshen. FEM analysis to anchored bulkhead structure[J]. Journal of Geotechnical Engineering, 1983, 5(2):22-34. [2] 孟庆山,孔令伟,陈能远,等. 桩锚挡墙联合支护残积土边坡离心模型试验研究[J].岩土力学, 2010, 31(11):3379-3384. MENG Qingshan, KONG Lingwei, CHEN Nengyuan, et al. Centrifugal model test on slope supporting with pile-anchor combined retaining wall[J]. Rock and Soil Mechanics, 2010, 31(11):3379-3384. [3] 唐仁华,陈昌富.锚杆挡土墙可靠度分析与计算方法[J].岩土力学,2012,33(5):1389-1394. TANG RenHua, CHEN ChangFu. Analysis and calculation method of reliability of anchored retaining wall[J]. Rock and Soil Mechanics, 2012, 33(5):1389-1394. [4] 何昌荣,李彤,陈群,等.新型预应力锚拉式桩板墙的三维有限元计算分析[J].岩石力学与工程学报,2003,22(5):843-848. HE Changrong, LI Tong, CHEN Qun, et al. 3D FEM analysis on new-style prestressed anchor sheet-pile retaining wall[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(5):843-848. [5] 朱维申,李术才,白世伟,等.施工过程力学原理的若干发展和工程实例分析[J].岩石力学与工程学报,2003,22(10):1586-1591. ZHU Weishen, LI Shucai, BAI Shiwei, et al. Some developments of principles for construction processes mechanics and some case history studies[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(10):1586-1591. [6] 李术才,朱维申,陈卫忠.小浪底地下洞室群施工顺序优化分析[J].煤炭学报,1996,21(4):393-398. LI Shucai, ZHU Weishen, CHEN Weizhong. Optimization of constructional sequence for excavation of a group of underground chambers in Xiaolangdi water conservancy project[J].Journal of China Coal Society, 1996, 21(4):393-398. [7] 朱维申,王平.动态规划原理在洞室群施工力学中的应用[J].岩石力学与工程学报,1992,11(4):323-331. ZHU Weishen, WANG Ping. Application of dynamic programing in construction mechanics of cavern groups[J]. Chinese Journal of Rock Mechanics and Engineering, 1992, 11(4):323-331. [8] 杜菊红.小间距隧道动态施工力学研究[D].上海:同济大学,2008. DU Juhong. Research on construction process mechanics of closely spaced tunnels[D]. Shanhai:Tongji University, 2008. [9] 赵尚毅,郑颖人,唐树名.路堑边坡施工顺序对边坡稳定性影响数值模拟分析[J].地下空间,2003,23(4):370-374. ZHAO Shangyi, ZHENG Yingren, TANG Shuming. Numerical simulation analysis for the influence of construction process of deep cut slop on its stability[J].Underground Space, 2003, 23(4):370-374. [10] 姚裕春,姚令侃,袁碧玉,等.施工时序对边坡稳定性影响的离心模型试验及数值分析[J]. 岩石力学与工程学报, 2006, 25(5):1075-1080. YAO Yuchun, YAO Lingkan, YUAN Biyu, et al. Centrifuge model test and numberical analysis of effects of excavation and support sequence on slope stability[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(5):1075-1080. [11] 许湘华,王强,方理刚.高速公路路堑边坡施工过程动态稳定性分析[J].中南大学学报:自然科学版, 2006, 37(5):1008-1012. XU Xianghua, WANG Qiang, FANG Ligang. Analysis on the stability of expressway slope during construction[J]. Journal of Central South University:Science and Technology, 2006, 37(5):1008-1012. [12] CHEN Zuyu, WANG Xiaogang, HABERFIELD C, et al. A three-dimensional slope stability analysis method using the upper bound theorem:Part I:theory and methods[J]. International Journal of Rock Mechanics and Mining Sciences, 2001, 38(3):369-378. [13] 陈祖煜,弥宏亮,汪小刚.边坡稳定三维分析的极限平衡方法[J].岩土工程学报, 2001,23(5):525-529. CHEN Zuyu, MI Hongliang, WANG Xiaogang. A three-dimensional limit equilibrium method for slope stability analysis[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(5):525-529. [14] 张均锋,丁桦.边坡稳定性分析的三维极限平衡法及应用[J]. 岩石力学与工程学报,2005,24(3):365-370. ZHANG Junfeng, DING Hua. General 3D limit-equilibrium method for slope stability analysis and its application[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(3):365-370. [15] 袁闻,徐青,陈胜宏,等.边坡稳定分析的三维极限平衡法及工程应用[J]. 长江科学院院报, 2013,30(4):56-61. YUAN Wen, XU Qing, CHEN Shenghong, et al. General 3D limit-equilibrium method for slope stability analysis and its application[J]. Journal of Yangtze River Scientific Research Institute, 2013, 30(4):56-61. [16] 陈祖煜.土力学经典问题的极限分析上、下限解[J]. 岩土工程学报, 2002, 24(01):1-11. CHEN Zuyu. Limit analysis for the classic problems of soil mechanics[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(01):1-11. [17] 郑颖人,赵尚毅,李安洪,等.有限元极限分析方法及其在边坡中的应用[M].北京:人民交通出版社, 2011. [18] 崔新壮,姚占勇,商庆森,等.加筋土坡临界高度的极限分析[J].中国公路学报,2007,30(1):1-6. CUI Xinzhuang, YAO Zhanyong, SHANG Qingsen, et al. Limit analysis of critical heights of reinforced soil slope[J].China journal of highway and transport, 2007, 30(1):1-6. [19] 崔新壮,金青,朱维申,等.圆形放坡基坑临界深度极限分析[J].土木工程学报,2007,40(1):60-64. CUI Xinzhuang, JIN Qing, ZHU Weishen, et al. Limit analysis of the critical depth of circular step-sloped foundation pits[J]. China civil engineering journal, 2007, 40(1):60-64. [20] 郑颖人,赵尚毅,张鲁渝.用有限元强度折减法进行边坡稳定分析[J].中国工程科学,2002,4(10):57-61. ZHENG Yingren, ZHAO Shangyi, ZHANG Luyu. Slope stability analysis by strength reduction FEM[J]. Engineering Science, 2002, 4(10):57-61. [21] 白云,侯学渊.软土地基劈裂注浆加固的机理和应用[J].岩土工程学报,1991,13(2):89-93. BAI Yun, HOU Xueyuan. The mechanism and application of fracture grouting method in soft foundation[J]. Chinese Journal of Geotechnical Engineering, 1991, 13(2):89-93. [22] 朱登元,管延华,刘惠忠,等.袖阀管劈裂注浆加固粉土路基实验研究[J].岩土工程学报,2012,34(8):1425-1431. ZHU Dengyuan, GUAN Yanhua, LIU Huizhong, et al. Model tests on fracture grouting reinforcement of silt embankment by using Soletanche method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(8):1425-1431. [23] 朱登元,张庆涛.袖阀管劈裂注浆加固技术数值模拟研究[J]. 铁道建筑,2012(11):73-75. ZHU Dengyuan, ZHANG Qingtao. Numerical simulation to soil reinforcement by using Soletanche method[J].Railway Engineering, 2012(11):73-75. [24] 管延华.强度衰减路基稳定性及其路面结构力学响应研究[D]. 徐州:中国矿业大学, 2011. GUAN Yanhua. Stability of attenuated strength subgrade and mechanics response of its pavement structure[D]. Xuzhou:China University of Mining and Technology, 2011. |
[1] | 刘金,李勤昌,马秀媛. 有限元强度折减法在边坡稳定分析中的应用[J]. 山东大学学报(工学版), 2016, 46(4): 83-88. |
[2] | 孙克国, 仇文革, 王中平, 高笑雁, 龚伦, 孔超. 高速公路改扩建工程对高铁隧道的近接施工影响[J]. 山东大学学报(工学版), 2015, 45(5): 70-76. |
[3] | 贾超, 张国荣. 基于强度折减法随机裂隙岩体结构稳定性分析[J]. 山东大学学报(工学版), 2013, 43(6): 57-64. |
[4] | 朱登元1,2,管延华1*. 毛细水作用对粉土路基稳定性的影响[J]. 山东大学学报(工学版), 2012, 42(1): 93-98. |
[5] | 杨文东1,张强勇1*,宋萌勃2,杨佳1. 基于破坏接近度和强度折减法的边坡稳定性评价[J]. 山东大学学报(工学版), 2010, 40(6): 82-87. |
|