JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE) ›› 2015, Vol. 45 ›› Issue (3): 80-85.doi: 10.6040/j.issn.1672-3961.0.2015.067
Previous Articles Next Articles
LYU Guoren1, ZHOU Hao1, LI Li2, GAO Quanting2, JIANG Zhuchang2
CLC Number:
[1] 刘钦, 李术才, 李利平,等. 软弱破碎围岩隧道大变形施工力学行为及支护对策研究[J]. 山东大学学报:工学版, 2011, 41(3):118-125. LIU Qin, LI Shucai, LI Liping, et al. Study of large deformation construction mechanical behavior and support measures of soft rock in a deep buried extra long tunnel[J]. Journal of Shandong University: Engineering Science, 2011, 41(3):118-125. [2] 孙星亮,景诗庭.水平钻孔旋喷注浆加固地层效果研究[J].岩石力学与工程学报,1998,17(5):589-593. SUN Xingliang, JING Shiting. Testing study on effect of horizontal drilling jet grouting for soil improvement[J]. Chinese Journal of Rock Mechanics and Engineering, 1998, 17(5): 589-593. [3] 刘浩,胡本涛. 高压旋喷桩在某地基加固工程中的应用[J].大连大学学报,2007, 8(6):62-65. LIU Hao, HU Bentao. Application of high-pressure rotating pile in the reinforcement of foundation[J]. Journal of Dalian University, 2007, 8(6):62-65. [4] 黄俊文, 仇玉良, 史宝童, 等. 水平旋喷桩超前预支护在风积沙隧道中的应用[J]. 公路, 2011, 9:246-250. HUANG Junwen, QIU Yuliang, SHI Baotong, et al. Application of advance pre-support by horizontal rotary Jet grouting piles in aeolian sand tunnel[J]. Highway, 2011, 9:246-250. [5] 刘晓曦,韩跃.水平旋喷桩在软弱土质隧道施工中的应用[J].世界隧道, 2000(2):63-65. LIU Xiaoxi, HAN Yue. Application of horizontal rotating and injecting pile to construction of soft soil tunnel[J]. The World Tunnel, 2000(2):63-65. [6] 罗成江. 黄土隧道中水平旋喷桩预支护施工技术[J]. 贵州工业大学学报:自然科学版, 2008, 37(6):189-192. LUO Chengjiang. The level of loess tunnel pre-support jet grouting construction technology[J]. Journal of Guizhou University of Technology: Natural Science Edition, 2008, 37(6):189-192. [7] 景诗庭,王海珍,孙星亮.水平钻孔喷射注浆技术的应用与研究展望[J].石家庄铁道学院学报,1999,12(2): 9-12. JING Shiting, WANG haizhen, SUN Xinliang. Application of the horizontal drilling jet grouting technique and prospect of research[J]. Journal of Shijiazhuang Railway Institute, 1999, 12(2):9-12. [8] 郭亮,肖晓春,黄均龙, 等.高压旋喷工艺中喷射流切割效果影响因素的研究[J].地下空间与工程学报,2008,4(5):937-942. GUO Liang, XIAO Xiaochun, HUANG Junlong, et al. Study on factors for cutting effect of high pressure jet flow in jet grouting[J]. Chinese Journal of Underground Space and Engineering, 2008, 4(5):937-942. [9] 于丽莉,胡长远,常浩.复合注浆法加固桩基础作用机理研究[J].水利与建筑工程学报,2008,6(3):107-109 YU Lili, HU Changyuan, CHANG Hao. Research on action mechanism for pile foundation reinforcement with composite grouting method[J]. Journal of Water Resources and Architectural Engineering, 2008, 6(3):107-109. [10] 刘勇,孙星亮.水平旋喷预支护技术在铁路隧道中的应用[J].岩石力学与工程学报,2002,21(6):905-909. LIU Yong, SUN Xingliang. Application of horizontal jet grouting reinforcement technique in railway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(6):905-909. [11] 王杰.岩土注浆理论与工程实例[M].北京:科学出版社,2001. [12] 黎中银.水平高压旋喷工法在预加固工程中的应用研究[D].北京:中国地质大学,2009. LI Zhongyin. Application of horizontal jet grouting at pre-reinforcing construction[D]. Beijing: China University of Geosciences, 2009. [13] 朱兆斌,杨玫. 采用高压旋喷桩加固铁路箱涵的基底应力与沉降计算[J].铁道勘察, 2008(1):66-68. ZHU Zhaobin, YANG Mei. Calculation on foundation bottom stress and settlement with high pressure jet-grouting piles to reinforce railway box beams and culverts[J]. Railway Survey, 2008(1):66-68. [14] 梁巍, 黄明利. 大跨度隧道 CRD 法穿越含水软弱层沉降变形控制[J]. 岩石力学与工程学报, 2007,26(增2):3738-3742. Liang Wei, Huang Liming. Subsidence and deformation control of large-span tunnel in water-bearing unfavorable geological conditions with CRD method[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(supp2):3738-3742. [15] 吕国仁, 张寿龙.隧道浅埋偏压段超前预测与围岩稳定控制研究[J]. 山东大学学报:工学版,2012, 42(5):102-107. LYU Guoren, ZHANG Shoulong. Research on advanced prediction and surrounding rock stability of shallow buried and unsymmetrical loaded section in tunnel excavation[J]. Journal of Shandong University: Engineering Science, 2012, 42(5):102-107. [16] 韩赟.含水弱胶结性砂岩隧道施工工法研究[D].北京:北京交通大学,2013. HAN Yun, The construction method study of the tunnel construction in the hydrous aquifer weakly cemented sandstone[D]. Beijing: Beijing Jiaotong University, 2013. [17] 胡学兵, 乔玉英. 偏压连拱隧道施工方法数值模拟研究[J]. 地下空间与工程学报, 2005, 1(3): 374-378. HU Xuebing, QIAO Yuying. Numerical analysis of construction method for partial press double-arch tunnel[J]. Chinese Journal of Underground Space and Engineering, 2005, 1(3):374-378. [18] 吴波,高波,骆建军.地铁区间隧道水平旋喷预加固效果数值模拟[J]. 西南交通大学学报,2004,39(5):605-608. WU Bo, GAO Bo, LUO Jianjun. Numerical simulation of reinforcing effect of horizontal drilling jet-grouting pegs on Shenzhen Metro Tunnel between stations[J]. Journal of Southwest Jiaotong University, 2004, 39(5):605-608. [19] 王祥秋, 杨林德, 高文华. 高速公路偏压隧道施工动态监测与有限元仿真模拟[J]. 岩石力学与工程学报, 2005,24(2): 284-289. WANG Xiangqiu, YANG Linde, GAO Wenhua. Dynamic monitoring and FEM simulation analysis of an expressway tunnel with unsymmetrical loadings[J].Chinese Journal of Rock Mechanics and Engineering, 2005, 24(2):284-289. [20] 吕国仁, 隋斌,王永进.浅埋偏压隧道开挖数值模拟及稳定性研究[J]. 山东大学学报:工学版,2013,43(4):68-73. LYU Guoren, SUI Bin, WANG Yongjin. Study on shallow buried tunnel excavation under unsymmetrical pressure with numerical simulation and stability analysis[J]. Journal of Shandong University: Engineering Science, 2013, 43(4):68-73. [21] 王毅才. 隧道工程[M]. 北京: 人民交通出版社,2000. [22] 李廷春,李术才,陈卫忠,等. 厦门海底隧道的流固耦合分析[J]. 岩土工程学报,2004,26(3):397-401. LI Tingchun, LI Shucai, CHEN Weizhong, et al. Coupled fluid-mechanical analysis of Xiamen Subsea Tunnel[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(3):397-401. [23] 周爱国. 隧道工程现场施工技术[M]. 北京: 人民交通出版社,2004. [24] 刘志刚,赵勇. 隧道隧洞施工地质技术[M]. 北京: 中国铁道出版社,2002. [25] 关宝树,国兆林. 隧道及地下工程[M]. 成都: 西南交通大学出版社,2000. |
[1] | LYU Guoren, ZHANG Qun, NIU Ben, GAO Quanting, WU Zhaoshou. The effects of pile foundation of high-rise building on adjacent structures [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(1): 48-58. |
[2] | ZHOU Qian, ZHAO Degang. Application of the horizontal jet grouting pile in water-bearing sandy layer of shallow excavating tunnel [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2014, 44(4): 52-57. |
[3] | ZHAN Yong-liang1, SHU Ji-cheng2, SHAO Guang-biao2, SUN Jian-ping2. In-situ measurement study on deformation and internal force of pile-anchor retaining excavation [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2014, 44(1): 69-74. |
[4] |
YI Xiao-ming1,2, WANG Song-gen2, SONG Xiu-guang1*, ZANG Ya-nan1.
Theoretical analysis of evaluation index for allowable subgrade uneven settlement [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(5): 68-73. |
[5] | ZHANG Na1,2, CUI Xin-zhuang1,2*, ZHANG Jiong1,2, ZHOU Ya-xu1,2, GAO Zhi-jun1,2, SUI Wei1,2. Settlement-controlling and pressure-reduction effect of pervious concrete pile under the action of embankment load [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(4): 80-86. |
[6] | JI Hui, SHANG Qiang-Sen, SHU Hai-Bei, CUI Xin-Zhuang, LIU Chao. Analysis of the key influencing factors of structure layer stress of asphalt pavement in goaf [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(6): 121-124. |
[7] | ZHOU Shou-Jun, ZHAO Wei-En, CHEN Ming-Jiu, TIAN Mao-Cheng. Research of the hydraulic adjustment method for a district heating system [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(3): 151-153. |
[8] | CUI Xin-zhuang,YAO Zhan-yong,SHANG Qing-sen . The application of dynamic compaction to the reconstruction of old road to expressway and its generalization [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(4): 53-56 . |
[9] | ZHAO Zhi-guang,WANG Deng-jie,TIAN Yun-fei . Roadbed settlement based on the gray theory [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2007, 37(3): 86-88 . |
|