JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE) ›› 2017, Vol. 47 ›› Issue (2): 32-36.doi: 10.6040/j.issn.1672-3961.0.2017.096

Previous Articles     Next Articles

Application of the ‘iron grate’ program in the area of rock burst

WANG Taixing1, WANG Xikui1, ZOU Junpeng2, TAN Xuyan2   

  1. 1. No. 3 Engineering Co., Ltd., China Gezhouba Group, Xi'an 710000, Shaanxi, China;
    2. State Key Laboratory of Geo-mechanics and Geo-technical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430000, Hubei, China
  • Received:2017-02-14 Online:2017-04-20 Published:2017-02-14

Abstract: To reduce the scale of rockburst control, the “iron grate” or “steel bar” scheme was analysed in this paper. The kinetic energy of different rockburst grades was calculated by using the elastic energy density of the surrounding rock mass after tunnel excavation. Based on the back analysis results of NJ-TBM tunnel ground stress and the stress release hole adopting in the engineering area, the maximum rock mass and the maximum velocity of different rockburst zones were determined. A “iron bar or bar row” solution was established by assuming that the maximum rock mass was impacted at the maximum speed to the steel plate / steel bar.Based on the model, the proposed scheme was applied to the strong rockburst, medium rockburst and weak rockburst respectively. The results showed that the program of steel arch spacing 1.5 m and the number of “iron grate”(Φ=20 mm)was 30 at each extension in the strong rockburst area hasnt appeared plastic area. The program of steel arch spacing 1.7 m and the number of “iron grate”(Φ=22 mm)was 20 at each extension in Medium rockburst area, the program of steel arch spacing 2.0 m and the number of “iron grate”(Φ=20 mm)was 20 at each extension in weak rockburst area hasnt appeared plastic area.So the proposed scheme wasnt produced plastic zone in the rockburst area.

Key words: back analysis, kinetic energy, application, esteel barr scheme, calculation model, rockburst, plastic zone

CLC Number: 

  • TU416.217
[1] 邱道宏, 陈剑平, 张秉鹤, 等.深埋长大公路隧道岩爆预测及防治研究[J].地下空间与工程学报, 2006, 2(6):950-955. QIU Daohong, CHEN Jianping, ZHANG Binghe, et al. Study on rockburst prediction and prevention in deep and over length highway tunnel[J]. Chinese Journal of Underground Space and Engineering, 2006, 2(6):950-955.
[2] 刘金海, 冯涛, 袁坚.基于非线性灰色归类模型的岩爆预测方法[J].地下空间与工程学报, 2005, 1(6):821-824. LIU Jinhai, FENG Tao, YUAN Jian. Rock burst prediction method based on the nonlinear grey model of classification[J]. Chinese Journal of Underground Space and Engineering, 2005, 1(6):821-824.
[3] 邓建, 朱合华, 丁文其.不等跨连拱隧道施工全过程的有限元模拟[J].岩土力学, 2004, 25(3):476-480. DENG Jian, ZHUHehua, DING Wenqi. Finite element simulation of whole excavation operation of a unequal-span double-arch tunnels[J]. Rock and Soil Mechanics, 2004, 25(3):476-480.
[4] SHABAROV A N. On formation of geodynamic zones prone to rock bursts and tectonic shocks[J]. Journal of Mining Science, 2001, 37(2):129-139.
[5] SINGH S P. Burst energy release index[J]. Rock Mechanics and Rock Engineering, 1988, 21(2):149-155.
[6] 张镜剑,傅冰骏. 岩爆及其判据和防治[J]. 岩石力学与工程学报,2008,27(10):2034-2042. ZHANG Jingjian, FU Bingjun. Rockburstand its criteria and control[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(10):2034-2042.
[7] 顾金才,范俊奇,孔福利,等. 抛掷型岩爆机制与模拟试验技术[J].岩石力学与工程学报,2014,33(6):1081-1089. GU Jincai, FAN Junqi, KONG Fuli. Mechanism of ejective rockburst and model testing technology l[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6):1081-1089.
[8] 谢和平,PARISEAU W J.岩爆的分形特征和机[J]. 岩石力学与工程学报,1993,12(1):28-37. XIE Heping, PARISEAU W G. Fractal character and mechanism of rockbursts[J].Chinese Journal of Rock Mechanics and Engineering, 1993, 12(1):28-37.
[9] 邱士利,冯夏庭,张传庆,等.深埋硬岩隧洞岩爆倾向性指标RVI 的建立及验证[J].岩石力学与工程学报,2011,30(6):1126-1141. QIU Shili, FENG Xiating, ZHANG Chuanqing, et al. Development and validation of rockburst vulnerability index(RVI)in deep hard rock tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(6):1126-1141.
[10] 景锋,边智华,杨火平,等.深埋长隧道地应力测量与岩爆预测分析[J].人民长江,2008,39(1):80-82,93. JING Feng, BIAN Zhihua, YANG Huoping, et al. Geo stress measurement and rockburst prediction for high buried tunnels[J]. Yangtze River, 2008, 39(1):80-82,93.
[11] 黄学军,姜永东. 隧道岩爆的判据与预测预报[J].矿业安全与环保,2005,32(2):7-9. HUANG Xuejun, JIANG Yongdong. Criterion for rock burst in tunnel and its forecast[J]. Mining Safety & Environmental Protection, 2005, 32(2):7-9.
[12] HOOK E,BROWN E T.岩石地下工程[M]. 北京:冶金工业出版社,1986
[13] 谷明成,何发亮,陈成宗.秦岭隧道岩爆的研究[J].岩石力学与工程学报,2002,21(9):1324-1329. GU Mingcheng, HE Faliang, CHEN Chengzong. Study on rockburst in Qinling tunnel[J].Chinese Journal of Rock Mechanics and Engineering, 2002, 21(9):1324-1329.
[14] 谭以安.模糊数学综合评判在地下洞室岩爆预测中的应用[C] //第二次全国岩石力学与工程学术会议论文集.北京:知识出版社,1989:247-253.
[15] 徐奴文, 唐春安,周济芳,等. 锦屏二级水电站施工排水洞岩爆数值模拟[J].山东大学学报(工学版),2009,39(4):134-139. XU Nuwen, TANG Chun'an, ZHOU Jifang, et al. Numerical simulation of rockburst on the drain tunnel in the Jinping Second Level Hydropower Station[J]. Journal of Shandong University(Engineering Science), 2009, 39(4):134-139.
[16] 武选正, 李名川, 伍宇腾. 锦屏水电枢纽辅助洞工程岩爆现象分析及防治措施[J].山东大学学报(工学版),2008,38(3):28-33. WU Xuanzheng, LI Mingchuan, WU Yuteng. Analysis and prevention measures for rockburst in the auxiliary tunnel of the Jinping Hydropower State[J]. Journal of Shandong University(Engineering Science), 2008, 38(3):28-33.
[17] 崔兰,王树仁. 深部圆巷开挖围岩能量耗散特征数值模拟分析[J].山东大学学报(工学版),2009,39(4):102-106. CUI Lan, WANG Shuren. Numerical simulation of the energy dissipation characteristics of an excavated circular tunnel under high stress conditions[J]. Journal of Shandong University(Engineering Science), 2009, 39(4):102-106.
[18] 陈宗基.岩爆工程实录、理论与控制[J].岩石力学与工程学报,1995, 12(6):11-117. TAN Tjongkie. Rockbursts, case records, theory and control[J]. Chinese Journal of Rock Mechanics and Engineering, 1995, 12(6):11-117.
[19] 陈卫忠,李术才,朱维申,等.急倾斜层状岩体中巨型地下洞室群开挖施工理论与优化研究[J].岩石力学与工程学报,2004,23(19):3281-3287. CHEN Weizhong, LI Shucai, ZHU Weishen. Excacation and optimization theory for giant underground caverns constructed in high dipping laminar strata[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(19):3281-3287.
[20] 冯夏庭,赵洪波.岩爆预测的支持向量机[J].东北大学学报,2002,23(1):57-59. FENG Xiating, ZHAO Hongbo. Prediction of rockburst using support vector machine[J]. Journal of Northeastern University(Natural Science), 2002, 23(1):57-59.
[21] 张波. 基于各向异性深埋公路隧道安全稳定性研究[D]. 武汉:中国科学院武汉岩土力学研究所,2007: 95-114. ZHANG Bo. Study on security and stability of deep buried highway tunnel based on anisotropic theory[D]. Wuhan: Institute of Rock and Soil Mechanics, 2007: 95-114.
[22] 姜云, 王兰生.深埋长大公路隧道高地应力岩爆和岩溶突水问题及对策[J].岩石力学与工程学报, 2002, 21(9):1319-1323. JIANG Yun, WANG Lansheng. Problems of high stress rock burst and water outburst and countermeasures in deep and long tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(9):1319-1323.
[23] 王青海, 李晓红, 艾吉人, 等.通渝隧道围岩变形和岩爆的数值模拟[J].地下空间, 2003, 23(3):291-296. WANG Qinghai, LI Xiaohong, AI Jiren, et al. Numerical simulation of rock deformation and rockburst of Tongyu Tunnel[J]. Underground Space, 2003, 23(3):291-296.
[24] 张永习. 可拓综合评判在某水工隧洞岩爆等级评价中的应用[J].山东大学学报(工学版),2012,42(2):58-63. ZHANG Yongxi. Application of extensible comprehensive evaluation for rock-burst prediction in a hydro-tunnel[J]. Journal of Shandong University(Engineering Science), 2012, 42(2):58-63.
[25] 张乐文,李镐,秦杰. 近蚀变带地应力异常分布对岩爆风险强度影响研究[J].山东大学学报(工学版),2009,39(4):30-44. ZHANG Lewen, LI Hao, QIN Jie. Impact of abnormal stress distribution near the alteration belt on rockburst risk strength[J]. Journal of Shandong University(Engineering Science), 2009, 39(4):30-44.
[1] HU Quanguang, CHEN Fangming, NING Guangzhong. Rockburst evaluation model and application of CW-TOPSIS [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(2): 20-25.
[2] FU Xiaoling, ZHANG Qi, ZHANG Chenghui. Sharing application mechanism of large-scale instrument and equipment in scientific research and teaching [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2016, 46(6): 83-88.
[3] LIU Jinhui. Back analysis of parameters of a deep foundation pit based on multi-objective nonlinear function [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2015, 45(4): 75-83.
[4] PAN Duo-tao1, HUANG Ming-zhong1, ZHANG Xue-jun2, YUAN De-cheng1. A static simulation model of overall process for the NGL recovery unit [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2012, 42(3): 57-62.
[5] LIU Hua-yong, LI Lu, ZHANG Da-ming. Quadratic Ball curve with multiple shape parameters [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2011, 41(2): 23-28.
[6] SHA Lu1,2, BAO Pei-ming1,2*, LI Ni-ge1,2. The research of a clustering algorithm based on the ant colony system [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2010, 40(3): 13-18.
[7] ZHANG Le-Wen, LI Gao, QIN Jie. Impact of abnormal stress distribution near the alteration belt on rock-burst risk strength [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(4): 30-33.
[8] XU Nu-Wen, TANG Chun-An, ZHOU Ji-Fang, TANG Lie-Xian, LIANG Zheng-Shao. Numerical simulation of rockburst on the drain tunnel in  the Jinping Second Level Hydropower Station [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(4): 134-139.
[9] LIU Ning, ZHU Wei-Shen, XIN Xiao-Li. Back   regression  analysis  on  the  initial  geostress  field  of  the  Shuangjiangkou  hydropower  station [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(6): 121-126.
[10] WU Xuan-zheng,LI Ming-chuan,WU Yu-teng . Analysis and prevention measures for rockburst in the auxiliary tunnel of the Jinping Hydropower State [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(3): 28-33 .
[11] GUO Juxiu,WANG Yanzhang . The lowcost realization of a simplified project of MAN technology RPR [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(5): 62-69 .
[12] CUI Fengyu . Design, implementation and application of EDA interactive graph editing system [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(4): 29-32 .
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!