Research on advanced prediction and surrounding rock stability of shallow buried and unsymmetrical loaded section in tunnel excavation

Lü Guo-ren1, ZHANG Shou-long2   

  1. 1. Shandong Provincial Key Laboratory of Road and Traffic Engineering in Colleges and Universities, Shandong Jianzhu University, Jinan 250101, China; 2. Shandong Construction Machinery Co. Ltd, Jinan 250121, China
  • Received:2012-04-16 Online:2012-10-20 Published:2012-04-16

Abstract: In order to study the surrounding rock stability of shallow buried and unsymmetrical loaded section, the geological radar was used to perform advanced geology forecast by taking the construction of Xiejiahe Tunnel of Yanhai Highway as an example. Based on the forecast results, the construction program was optimized and the leading ductule injecting was adopted. The site monitoring was also employed and the results demonstrated that the data were stable and the construction program was feasible. The shallow buried and unsymmetrical section of the Xiejiahe tunnel was stable enough to assure tunnel construction going on smoothly. Furthermore, it could provide reference for similar engineerings.

Key words: tunnel, shallow buried unsymmetrical, surrounding rock stability, advanced prediction

CLC Number: 

  • U451.2
[1] ZHOU Chenying. Image analysis and engineering application of ground penetrating radar in tunnel lining detection [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2018, 48(4): 61-68.
[2] SONG Guijie. Deformation characteristic and instability analysis for shallow soft rock section during tunnel-entering construction [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2018, 48(2): 53-60.
[3] LIU Jifeng, YANG Huanhuan. Risk control of extremely close twin shield tunnels nearby passing intensive buildings based on informative construction [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(3): 102-111.
[4] ZHOU Lun, LI Shucai, XU Zhenhao, LI Liping, HUANG Xin, HE Shujiang, LI Guohao. Integrated advanced geological prediction technology of tunnel and its engineering application [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(2): 55-62.
[5] BAI Xianjun, WANG Taixing, WEI Xin, ZHAO Wusheng. Effect of the velocity pulse on the seismic response of the tunnel [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(2): 14-19.
[6] WAN Li, WANG Chunhe, WANG Qi, LI Shucai, SHAO Xing, JIANG Bei, SUN Huibin, QIN Qian. The control mechanism for super section tunnel on weak surrounding rock and its application [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(1): 59-67.
[7] BAO Jianye, WANG Jing. Prediction of flow rate during tunnel excavation based on discrete fracture network models [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2016, 46(6): 127-134.
[8] ZHANG Luchen, LI Shuchen, LI Shucai, LIAO Qikai. Effect on the performance of shotcrete mixed with silica fume and fly ash [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2016, 46(5): 102-109.
[9] SUN Keguo, QIU Wenge, WANG Zhongping, GAO Xiaoyan, GONG Lun, KONG Chao. Study on approaching excavation influence between expanding projects of expressway and high speed railway tunnel under operation state [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2015, 45(5): 70-76.
[10] GAO Zhijun, CUI Xinzhuang, SUI Wei, GUO Hong, LIU Hang, LI Changyi, FENG Hongbo. Dynamic interaction and damage analysis of large runaway vehicle and tunnel lining [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2014, 44(5): 49-57.
[11] ZHOU Qian, ZHAO Degang. Application of the horizontal jet grouting pile in water-bearing sandy layer of shallow excavating tunnel [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2014, 44(4): 52-57.
[12] ZHOU Luan-ai1, TANG Wen-zuo2, CUI Xiao-hua3, SUI Hui-bin4*. null [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(6): 83-88.
[13] L Guo-ren1, SUI Bin2, WANG Yong-jin1, WU Jian-quan3. Study on numerical simulation and stability analysis shallow buried tunnel excavation under unsymmetrical  pressure [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(4): 68-73.
[14] WEI Yi 1, SHEN Ji-zhong 2. Design methodology of ternary logic circuit on resonant tunneling diode [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(3): 94-98.
[15] SUN Huai-feng1, LI Shu-cai1, LI Xiu2, QI Zhi-peng2, LIU Lei2, XUE Yi-guo1, SU Mao-xin1, LIU Bin1, ZHANG Wen-jun1. Feasibility of using magnetic resonance sounding in prediction of water bearing structures in front of a tunnel face [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(1): 92-97.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!