Study on full face hard rock tunnel boring machine through the overpass in composite stratum

Chunguo WANG()   

  1. Tunnel Engineering Co., Ltd., China Railway 14 Bureau Group, Jinan 250003, Shandong, China
  • Received:2020-12-15 Online:2021-06-20 Published:2021-06-24

Abstract:

By using the numerical calculation method, the double tunnel underpass overpass was established according to the actual engineering situation, the strain law of the tunnel underpass municipal bridge was comprehensively analyzed, the multi-point displacement of the bridge was monitored, and the weak point reinforcement measures of the tunnel orthogonal underpass bridge were proposed. The results showed that the influence of the two-way simultaneous excavation of the right tunnel was almost the same as that of the two-way simultaneous excavation of the right tunnel. The left tunnel was excavated first and then the right tunnel was excavated. The uplift part of the bridge deck would gradually subside with the excavation of the right tunnel. It could be seen that the left tunnel excavation first and then the right tunnel excavation had the largest impact on the bridge deck, which was easy to cause the uneven settlement of the bridge. The uneven settlement of bridge deck caused by tunnel excavation could temporarily support and reinforce the piers, and the circumferential soil around the piers could be replaced with concrete to reduce the settlement of the piers and bridge deck.

Key words: subway tunnel, full face hard rock tunnel boring machine, numerical simulation, underground engineering, tunnel excavation

CLC Number: 

  • TU45

Fig.1

Vertical section diagram of Underpass section"

Fig.2

Numerical calculation model of TBM through the overpass"

Table 1

Parameters of stratum and building materials"

地层 密度/(kg·m-3) 弹性模量/MPa 泊松比 黏聚力/kPa 内摩擦角/(°)
素填土 1800 3 0.20 10 20.0
粉质黏土 2200 60 0.25 26 30.0
强风化花岗岩 2630 36 000 0.25 30 000 48.0
中风化花岗岩 2680 47 000 0.25 35 000 52.0
微风化花岗岩 2750 58 000 0.25 40 000 55.0
C30混凝土 2400 30 000 0.20
C50混凝土 2500 34 500 0.20

Fig.3

Variation diagram of vault settlement with construction steps"

Fig.4

Vertical settlement displacement diagram"

Fig.5

Vertical displacement nephogram of bridge deck"

Fig.6

Vertical displacement nephogram of bridge deck"

Fig.7

Displacement curve of characteristic monitoring point"

Fig.8

Displacement of tunnel lining structure"

Fig.9

Nephogram of maximum shear stress of bridge structure"

1 黄戡, 孙逸玮, 赵磊, 等. 盾构穿越上软下硬复合地层时的管片力学特性[J]. 中南大学学报(自然科学版), 2020, 51 (5): 1371- 1383.
HUANG Kan , SUN Yiwei , ZHAO Lei , et al. Mechanical properties of segments when shield passes through upper-soft and lower-hard composite strata[J]. Journal of Central South University (Natural Science Edition), 2020, 51 (5): 1371- 1383.
2 蔡兵华, 崔德山, 冯晓腊, 等. 武汉岩溶区复合地层小型盾构施工引起的地表变形规律研究[J]. 安全与环境工程, 2020, 27 (1): 69- 74.
CAI Binghua , CUI Deshan , FENG Xiaola , et al. Study on surface deformation caused by small shield construction in karst area of Wuhan[J]. Safety and Environmental Engineering, 2020, 27 (1): 69- 74.
3 刘天雄, 陈辉华, 李瑚均. 复合地层盾构施工安全影响因素及安全事故致因机理[J]. 铁道科学与工程学报, 2020, 17 (1): 266- 272.
LIU Tianxiong , CHEN Huihua , LI Hujun . Safety influencing factors and safety accident mechanism of shield construction in composite stratum[J]. Journal of Railway Science and engineering, 2020, 17 (1): 266- 272.
4 史林肯, 周辉, 宋明, 等. 深部复合地层TBM开挖扰动模型试验研究[J]. 岩土力学, 2020, 41 (6): 1933- 1943.
SHI Linken , ZHOU Hui , SONG Ming , et al. Exp-erimental study on disturbance model of TBM excavation in deep composite strata[J]. Geotechnical Mechanics, 2020, 41 (6): 1933- 1943.
5 刘力, 李名淦, 高辛财, 等. 盾构下穿复合地基高层建筑相互安全影响分析[J]. 特种结构, 2019, 36 (5): 51- 56.
LIU Li , LI minggan , GAO Xincai , et al. Analysis on mutual safety influence of shield tunneling under composite foundation high-rise buildings[J]. Special Structures, 2019, 36 (5): 51- 56.
6 于云龙, 管晓明, 王旭春, 等. 砂黏复合地层盾构掘进参数变化规律及掘进速率预测研究[J]. 隧道建设(中英文), 2019, 39 (7): 1125- 1131.
YU Yunlong , GUAN Xiaoming , WANG Xuchun , et al. Study on variation law of shield tunneling parameters and prediction of tunneling rate in sand clay composite stratum[J]. Tunnel Construction (Chinese and English), 2019, 39 (7): 1125- 1131.
7 刘建东, 郭京波, 王旭东. 基于盾构掘进参数的孤石地层识别方法研究[J]. 隧道建设(中英文), 2019, 39 (7): 1132- 1140.
LIU Jiandong , GUO Jingbo , WANG Xudong . Study on Boulder stratum identification method based on shield tunneling parameters[J]. Tunnel Construction (Chinese and English), 2019, 39 (7): 1132- 1140.
8 赵晓勇. TBM法隧道施工下穿涵洞的数值模拟研究[J]. 地下空间与工程学报, 2011, 7 (3): 513- 517.
ZHAO Xiaoyong . Numerical simulation of tunnel construction under culvert with TBM method[J]. Journal of Underground Space and Engineering, 2011, 7 (3): 513- 517.
9 靳宝成. TBM下穿高速公路施工安全性分析[J]. 兰州交通大学学报, 2011, 30 (6): 9- 11.
doi: 10.3969/j.issn.1001-4373.2011.06.003
JIN Baocheng . Safety analysis of TBM underpass expressway construction[J]. Journal of Lanzhou Jiaotong University, 2011, 30 (6): 9- 11.
doi: 10.3969/j.issn.1001-4373.2011.06.003
10 刘赟君, 李化云, 黄丹. 复合地层TBM隧道施工引起建筑物沉降规律研究[J]. 隧道建设(中英文), 2019, 39 (4): 594- 600.
LIU Fujun , LI Huayun , HUANG Dan . Study on building settlement caused by TBM tunnel construction in composite stratum[J]. Tunnel Construction (Chinese and English), 2019, 39 (4): 594- 600.
11 何川, 陈凡, 黄钟晖, 等. 复合地层双模盾构适应性及掘进参数研究[J]. 岩土工程学报, 2021, 43 (1): 43- 52.
HE Chuan , CHEN Fan , HUANG Zhonghui , et al. Study on adaptability and driving parameters of dual-mode shield in composite stratum[J]. Journal of Geotechnical Engineering, 2021, 43 (1): 43- 52.
12 孙鹤明, 汪强宗, 张磊, 等. 复合地层双线TBM隧道施工对临近建筑物影响[J]. 地下空间与工程学报, 2016, 12 (增刊2): 733- 738.
SUN Heming , WANG qiangzong , ZHANG Lei , et al. Influence of double track TBM tunnel construction on adjacent buildings in composite stratum[J]. Journal of Underground Space and Engineering, 2016, 12 (Suppl.2): 733- 738.
13 郭双喜, 金平, 汲广坤, 等. 复合地层盾构上方建筑物沉降特征及原因[J]. 中外公路, 2020, 40 (3): 16- 21.
GUO Shuangxi , JIN Ping , JI Guangkun , et al. Sett-lement characteristics and causes of buildings above composite ground shield[J]. Sino Foreign Highway, 2020, 40 (3): 16- 21.
[1] LIU Qiming, WANG Wenhui, PAN Yingnan, GAO Yaohui, ZHENG Chengcheng, HE Peng. Influence of thickness defects on the stability of the primary support structure and risk assessment [J]. Journal of Shandong University(Engineering Science), 2025, 55(5): 165-178.
[2] Yuxin WANG,Sizhong LÜ,Wang YAO,Chunjin LIN,Ming ZHANG,Zhaofeng LI,Jian ZHANG,Yansheng WANG. Parameter design and effect evaluation of pile side splitting grouting insilty clay stratum [J]. Journal of Shandong University(Engineering Science), 2023, 53(6): 70-81.
[3] Pengning GUO,Wei LIU,Hao YUAN,Shuo FENG,Yangang WANG. Analysis of screw extrusion dehydration efficiency based on micro element discrete model [J]. Journal of Shandong University(Engineering Science), 2023, 53(1): 114-121.
[4] Yiming ZHANG,Yunpeng LI,Jing LI,Junyu CONG. Development of numerical calculation for coupled multi-field problems in cracked/porous media [J]. Journal of Shandong University(Engineering Science), 2022, 52(6): 63-78.
[5] Weiqin ZHENG,Jie XU,Jie SUN,Ke WU. Mechanical characteristics of TBM tunnel segment in composite stratum [J]. Journal of Shandong University(Engineering Science), 2022, 52(4): 210-213.
[6] TIAN Li,Wenzhe BI,Sarim Saleem SIDDIQUI,Kaiyue LIU. Review on structural resistance to downburst wind loads [J]. Journal of Shandong University(Engineering Science), 2021, 51(5): 32-41.
[7] LU Guangzhao, ZHOU Bo, XU Feng, SHANGGUAN Wei, WANG Gang, ZHANG Shubo. Stability analysis and construction mechanics of shallow buried bias tunnel openings [J]. Journal of Shandong University(Engineering Science), 2021, 51(4): 61-70.
[8] WANG Chunguo. Optimization of ventilation system of TBM tunnel construction and evaluation of dust suppression effect [J]. Journal of Shandong University(Engineering Science), 2021, 51(3): 52-60.
[9] SUN Jie, WU Ke, ZHENG Yang, LI Shuchen, YUAN Chao, WANG Xiuwei. Influence of TBM tunnel excavation at different positions on buildings [J]. Journal of Shandong University(Engineering Science), 2021, 51(1): 32-38.
[10] SU Sibo, WANG Guoqing, JIA Xianzhuo, LI Zhicong, HUANG Zhigang. Influence of shear span ratio on seismic performance of hollow pipe pier with slot connection [J]. Journal of Shandong University(Engineering Science), 2021, 51(1): 39-45.
[11] XU Zaigen, LIU Zhengwei, LIU Wenpeng, ZHOU Mengyao, LIU Juncai, TIAN Li. Calculation method of the single-double angle joints in transmission towers [J]. Journal of Shandong University(Engineering Science), 2021, 51(1): 87-93.
[12] CHEN Yucheng, WANG Zhaoyang, GUO Ming, LIN Peng. Influence of concealed karst cave on surrounding rock stability and its treatment technology [J]. Journal of Shandong University(Engineering Science), 2020, 50(5): 33-43.
[13] Jinsheng QI, Hongzhen CAO, Yan SHI, Wenjing DU, Zhan WANG. Optimization of the inner deflector of the shrimp-waist elbow [J]. Journal of Shandong University(Engineering Science), 2020, 50(5): 64-69.
[14] CAO Hongzhen, QI Jinsheng, YUAN Baoqiang, DU Wenjing, WANG Zhan. Numerical simulation of the tangent circular-to-rectangular transition duct [J]. Journal of Shandong University(Engineering Science), 2020, 50(5): 77-82.
[15] WANG Chunguo. Mechanical behavior of large-span and small spacing road tunnel with biased pressure [J]. Journal of Shandong University(Engineering Science), 2020, 50(4): 85-89.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] ZHANG Yong-hua,WANG An-ling,LIU Fu-ping . The reflected phase angle of low frequent inhomogeneous[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(2): 22 -25 .
[2] LI Kan . Empolder and implement of the embedded weld control system[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(4): 37 -41 .
[3] LAI Xiang . The global domain of attraction for a kind of MKdV equations[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(1): 87 -92 .
[4] YU Jia yuan1, TIAN Jin ting1, ZHU Qiang zhong2. Computational intelligence and its application in psychology[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 1 -5 .
[5] CHEN Rui, LI Hongwei, TIAN Jing. The relationship between the number of magnetic poles and the bearing capacity of radial magnetic bearing[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2018, 48(2): 81 -85 .
[6] WANG Bo,WANG Ning-sheng . Automatic generation and combinatory optimization of disassembly sequence for mechanical-electric assembly[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(2): 52 -57 .
[7] ZHANG Ying,LANG Yongmei,ZHAO Yuxiao,ZHANG Jianda,QIAO Peng,LI Shanping . Research on technique of aerobic granular sludge cultivationby seeding EGSB anaerobic granular sludge[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(4): 56 -59 .
[8] Yue Khing Toh1, XIAO Wendong2, XIE Lihua1. Wireless sensor network for distributed target tracking: practices via real test bed development[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 50 -56 .
[9] SUN Weiwei, WANG Yuzhen. Finite gain stabilization of singlemachine infinite bus system subject to saturation[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 69 -76 .
[10] SUN Yu-li,LI De-fa,ZUO Dun-wen,QI mei . [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(6): 19 -23 .