Integrated acquisition method of adverse geology and rock properties ahead of tunnel face in TBM construction tunnel

LIU Bin1, LI Shucai1, LI Jianbin2, WANG Yujie3, ZHANG Jianqing4,5, NIE Lichao1, WANG Xueliang6   

  1. 1. Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061, Shandong, China;
    2. China Railway Engineering Equipment Group Co Ltd, Zhengzhou 450016, Henan, China;
    3. Department of Geotechnical Engineering, China Institute of Water Resources and Hydropower Research, Beijing 100048, China;
    4. Changjiang Engineering Geophysical Exploration(Wuhan)Co Ltd, Wuhan 430010, Hubei, China;
    5. Changjiang Institute of Survey, Planning, Design and Research, Wuhan 430010, Hubei, China;
    6. China Railway Engineering Consultants Group Co Ltd, Beijing 100055, China
  • Received:2016-12-16 Online:2016-12-20 Published:2016-12-16

Abstract: TBM construction tunnel was easily hampered by hazard and accidents like water inrush, collapse and TBM jam, in the occurrence of faults, fractured zone and karstic area, which could cause the losing of TBM excavation efficiency and delay the tunnel construction. It was because of the complex environment in TBM construction tunnel that the adverse geology and rock properties was hard to be acquired. To solve the problem, a solving methodology was put forth based on geological prospecting and rock property estimation. The methodology was consisted of ahead geological prospecting by using geophysical methods and rock properties estimation based on the relationship between the rock properties 山 东 大 学 学 报 (工 学 版)第46卷 - 第6期刘斌,等:TBM掘进前方不良地质与岩体参数的综合获取方法 \=-and TBM machine data. In this methodology, the 3D seismic prospecting method was used to identify and locate the faults, fractured zone or karst cave ahead of the tunnel face. The 3D IP method was used to prospect the water bearing geological structure ahead of tunnel face. In addition, the rock properties were estimated by means of machine learning. The uniaxial compression strength of the surrounding rocks was estimated using data mining. Based on three methods mentioned above, an integrated acquisition method and its procedure of adverse geology and rock properties were proposed. With the test and verification in the field case of a project, the proposed methodology was proved to be feasible and could provide reasonable reference for TBM excavation.

Key words: ahead geological prospecting, ahead prospecting with three dimensional seismic method, ahead prospecting with three dimensional induced polarization, TBM construction, rock properties estimation

CLC Number: 

  • U45
[1] 李术才,刘斌,孙怀凤,等. 隧道施工超前地质预报研究现状及发展趋势[J]. 岩石力学与工程学报,2014,33(6):1090-1113. LI Shucai, LIU Bin, SUN Huaifeng, et al. State of art and trends of advanced geological prediction in tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6):1090-1113.
[2] 张镜剑,傅冰骏. 隧道掘进机在我国应用的进展[J]. 岩石力学与工程学报,2007,26(2):226-238. ZHANG Jingjian, FU Bingjun. Advances in tunnel boring machine application in China[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2): 226-238.
[3] PETRONIO L, POLETTO F. Seismic-while-drilling by using tunnel boring machine noise[J]. Geophysics, 2002, 67(6): 1798-1809.
[4] BORM G, GIESE R, OTTO P, et al. Integrated seismic imaging system for geological prediction during tunnel construction[C] //Proceedings of 10th ISRM Congress,International Society for Rock Mechanics. [S. l.] :[s. n.] , 2003:137-142.
[5] KAUS A, BOENING W. BEAM-geoelectrical ahead monitoring for TBM-drives[J]. Geomechanics and Tunnelling, 2008, 1(5): 442-449.
[6] 朱劲, 李天斌, 李永林, 等. Beam 超前地质预报技术在铜锣山隧道中的应用[J]. 工程地质学报, 2007, 15(2): 258-262. ZHU Jin, LI Tianbin, LI Yonglin, et al. Application of an electrical method “BEAM” for advanced geological exploration to tunneling in TongLuo mountains for Dian-Lin highway[J]. Journal of Engineering Geology, 2007, 15(2):258-262.
[7] 李术才,刘斌,刘征宇,等. TBM 施工隧道前向三维激发极化法超前探测装置系统及方法[P]. 中国:ZL2013100051329, 2013-05-01.
[8] YAMAMOTO T, SHIRASAGI S, YAMAMOTO S, et al. Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data[J]. Tunnelling and Underground Space Technology, 2003, 18(2): 213-221.
[9] 岳中琦. 钻孔过程监测(DPM)对工程岩体质量评价方法的完善与提升[J]. 岩石力学与工程学报,2014,33(10):1977-1996. YUE Zhongqi. Drilling process monitoring for refining and upgrading rock mass quality classification methods[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(10):1977-1996.
[10] 钱七虎. 地下工程建设安全面临的挑战与对策[J]. 岩石力学与工程学报,2012,31(10):1945-1956. QIAN Qihu. Challenges faced by underground projects construction safety and counter measures[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(10): 1945-1956.
[11] FROUGH O, TORABI S R, YAGIZ S. Application of RMR for estimating rock-mass-related TBM utilization and performance parameters: a case study[J]. Rock Mechanics and Rock Engineering, 2015, 48(3): 1305.
[12] BENATO A, ORESTE P. Prediction of penetration per revolution in TBM tunneling as a function of intact rock and rock mass characteristics[J]. International Journal of Rock Mechanics and Mining Sciences, 2015, 74: 119-127.
[13] 宋杰. 隧道施工不良地质三维地震超前探测方法及其工程应用[D].济南:山东大学,2016. SONG Jie. The three dimensional seismic ahead prospecting method and its application for adverse geology in tunnel construction[D]. Jinan: Shandong University, 2016.
[14] 阮百尧, 邓小康, 刘海飞, 等. 坑道直流电阻率超前聚焦探测新方法研究[J]. 地球物理学报, 2009, 52(1): 289-296. RUAN Baiyao, DENG Xiaokang, LIU Haifei, et al. Research on a new method of advanced focus detection with DC resistivity in tunnel[J]. Chinese Journal of Geophysics, 2009, 52(1): 289-296.
[15] 柳建新, 邓小康, 郭荣文, 等. 坑道直流聚焦超前探测电阻率法有限元数值模拟[J]. 中国有色金属学报, 2012, 22(3): 970-975. LIU Jianxin, DENG Xiaokang, GUO Rongwen, et al. Numerical simulation of advanced detection with DC focus resistivity in tunnel by finite element method[J]. Chinese Journal of Nonferrous Metals, 2012, 22(3): 970-975.
[16] 李术才, 聂利超, 刘斌, 等. 多同性源阵列电阻率法隧道超前探测方法与物理模拟试验研究[J]. 地球物理学报, 2015, 58(4): 1434-1446. LI Shucai, NIE Lichao, LIU Bin, et al. Advanced detection and physical model test based on multi-electrode sources array resistivity method in tunnel[J]. Chinese Journal of Geophysics, 2015, 58(4): 1434-1446.
[17] 聂利超. 隧道施工含水构造激发极化定量超前地质预报理论及其应用[D]. 济南:山东大学,2014. NIE Lichao. Quantitative identification theory and its application of advanced geological prediction for water-bearing structure using induced polarization in tunnel construction period[D]. Jinan: Shandong University, 2014.
[18] 周志华. 机器学习[M]. 北京: 清华大学出版社, 2016.
[19] PLATT J. Sequential minimal optimization: a fast algorithm for training support vector machines[R]. https://www.microsoft.com/en-us/research/publication/sequential-minimal-optimization-a-fast-algorithm-for-training-support-vector-machines/.[2016-12-16] (1998-04-21).
[1] Jun LIU,Lijun HAN,Qingbin MENG. TBM comprehensive advanced geological prediction in a tunnel andits application in Yangling Tunnel [J]. Journal of Shandong University(Engineering Science), 2019, 49(4): 51-60.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] LI Kan . Empolder and implement of the embedded weld control system[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(4): 37 -41 .
[2] SHI Lai-shun,WAN Zhong-yi . Synthesis and performance evaluation of a novel betaine-type asphalt emulsifier[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2008, 38(4): 112 -115 .
[3] LAI Xiang . The global domain of attraction for a kind of MKdV equations[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(1): 87 -92 .
[4] YU Jia yuan1, TIAN Jin ting1, ZHU Qiang zhong2. Computational intelligence and its application in psychology[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 1 -5 .
[5] CHEN Rui, LI Hongwei, TIAN Jing. The relationship between the number of magnetic poles and the bearing capacity of radial magnetic bearing[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2018, 48(2): 81 -85 .
[6] WANG Bo,WANG Ning-sheng . Automatic generation and combinatory optimization of disassembly sequence for mechanical-electric assembly[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(2): 52 -57 .
[7] ZHANG Ying,LANG Yongmei,ZHAO Yuxiao,ZHANG Jianda,QIAO Peng,LI Shanping . Research on technique of aerobic granular sludge cultivationby seeding EGSB anaerobic granular sludge[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(4): 56 -59 .
[8] WANG Li-ju,HUANG Qi-cheng,WANG Zhao-xu . [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2006, 36(6): 51 -56 .
[9] Yue Khing Toh1, XIAO Wendong2, XIE Lihua1. Wireless sensor network for distributed target tracking: practices via real test bed development[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 50 -56 .
[10] SUN Weiwei, WANG Yuzhen. Finite gain stabilization of singlemachine infinite bus system subject to saturation[J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2009, 39(1): 69 -76 .