JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE) ›› 2017, Vol. 47 ›› Issue (1): 59-67.doi: 10.6040/j.issn.1672-3961.0.2016.232

Previous Articles     Next Articles

The control mechanism for super section tunnel on weak surrounding rock and its application

WAN Li1, WANG Chunhe2, WANG Qi3*, LI Shucai3, SHAO Xing1, JIANG Bei3,4, SUN Huibin3, QIN Qian3   

  1. 1.Shandong Provincial Communications Planning and Design Institute, Jinan 250031, Shandong, China;
    2. China State Construction Shandong Investment Company Limited, Jinan 250101, Shandong, China;
    3. Geotechnical and Structural Engineering Research Center, Shandong University, Jinan 250061, Shandong, China;
    4. School of Civil Engineering and Architecture, Jinan University, Jinan 250022, Shandong, China
  • Received:2016-06-27 Online:2017-02-20 Published:2016-06-27

Abstract: For making clear the failure control mechanism of super section tunnel, numerical experiments of weak rock control mechanism applied to super section tunnel were systematically carried out by the excavation methods that included CRD and double side wall drift methods. The change laws of tunnel surrounding rock deformation and supporting components force were compared and analyzed under four types of supporting schemes and different excavation methods, which included excavation without support, bolt support, H-beam arch support and H-beam-bolt support. The control mechanism of super section tunnel with weak surrounding rock was acquired. Field experiments of H type steel and anchor net shot rete combined support section tunnel were carried out by the excavation methods that including CRD and double side wall drift methods, and the vault settlement were 27.2 mm and 18.7 mm. The results showed that this support system had great effect on the stability control of surrounding rock and could ensure the safety of the site.

Key words: weak surrounding rock, numerical experiment, control mechanism, super large section, tunnel, field tests

CLC Number: 

  • TU45
[1] 洪开荣. 我国隧道及地下工程发展现状与展望[J]. 隧道建设, 2015(2):95-107. HONG Kairong. State-of-art and prospect of tunnels and underground works in China[J]. Tunnel Construction, 2015(2):95-107.
[2] 胡元芳.小线间距城市双线隧道围岩稳定性分析[J].岩石力学与工程学报,2002, 21(9):1335-1338. HU Yuanfang. Stability analysis of surrounding rocks of double-hole urban tunnel with small interval[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(9):1335-1338.
[3] GOLSHANI A, ODA M, OKUI Y, et al. Numerical simulation of the excavation damaged zone around an opening in brittle rock[J]. International Journal of Rock Mechanics and Mining Sciences, 2007, 44(6):835-845.
[4] HUANG F, ZHU H, XU Q, et al. The effect of weak interlayer on the failure pattern of rock mass around tunnel-scaled model tests and numerical analysis[J]. Tunnelling and Underground Space Technology, 2013, 35:207-218.
[5] 安永林. 偏压隧道围岩压力分布规律理论研究[J].湖南科技大学学报(自然科学版),2011, 26(4):47-50. AN Yonglin. Study on principle of rock pressure distribution of unsymmetrical pressure tunnel[J]. Journal of Hunan University of Science and Technology(Natural Science Edition), 2011, 26(4):47-50.
[6] 王义重,李勇泉,傅旭东.求水山隧道下穿机荷高速段新奥法施工有限元计算[J].岩土力学,2011, 32(1):125-131. WANG Yizhong, LI Yongquan, FU Xudong. Finite element calculation of NATM construction of Qiushui mountain tunnel beneath Jihe expressway[J]. Rock and Soil Mechanics, 2011, 32(1):125-131.
[7] 张国华, 陈礼彪, 钱师雄, 等. 大断面小净距大帽山隧道现场监控量测及分析[J]. 岩土力学, 2010, 31(2):489-496. ZHANG Guohua, CHEN Libiao, QIAN Shixiong, et al. On-site supervision measure and analysis of Damaoshan tunnels with large section and small clear-distance[J]. Rock and Soil Mechanics, 2010, 31(2):489-496.
[8] 张志强,阚呈,孙飞,等. 碎屑流地层隧道发生灾变的模型试验研究[J]. 岩石力学与工程学报, 2014, 33(12):2451-2458. ZHANG Zhiqiang, KAN Cheng, SUN Fei, et al. Experimental study of catastrophic behavior for natm tunnel in debris flow strata[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(12):2451-2458.
[9] 岳顺, 代高飞, 皮文丽. 浅埋大跨连拱隧道的变形监控及数值模拟[J]. 重庆大学学报, 2008, 31(5):568-572. YUE Shun, DAI Gaofei, PI Wenli. Deformation monitoring and numerical simulation of shallowly-buried long-span double-arch tunnel[J]. Journal of Chongqing University, 2008, 31(5):568-572.
[10] 吴梦军, 黄伦海. 四车道公路隧道动态施工力学研究[J]. 岩石力学与工程学报, 2006, 25(1):3057-3062. WU Mengjun, HUANG Lunhai. Research on dynamic construcion mechanics of four-Lan highway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(1):3057-3062.
[11] 王明年, 郭军, 罗禄森, 等. 高速铁路超大断面黄土隧道深浅埋分界深度研究[J]. 岩土力学, 2010, 31(4):1157-1162. WANG Mingnian, GUO Jun, LUO Lusen, et al. Study of critical buried depth of large cross-section loess tunnel for high speed railway[J]. Rock and Soil Mechanics, 2010, 31(4):1157-1162.
[12] 朱泽兵, 刘新荣, 张永兴. 大跨超浅埋轻轨车站隧道开挖方法研究[J]. 岩石力学与工程学报, 2005, 24(2):290-295. ZHU Zebing, LIU Xinrong, ZHANG Yongxing. Study of excavation method for ultra-shallow-buried light railway station tunnels with larger span[J].Chinese Journal of Rock Mechanics and Engineering, 2005, 24(2):290-295.
[13] 吴张中, 徐光黎, 吴立, 等. 超大断面隧道侧向扩挖施工围岩力学特征研究[J]. 岩土工程学报, 2009, 31(2):172-177. WU Zhangzhong, XU Guangli, WU Li, et al. Mechanical deformation characteristics of rock mass surrounding lateral enlarging excavation of tunnels with ultra-large sections[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(2):172-177.
[14] 刘钦, 李术才, 李利平, 等. 软弱破碎围岩隧道大变形施工力学行为及支护对策研究[J]. 山东大学学报(工学版), 2011, 41(3):118-125. LIU Qin, LI Shucai, LI Liping, et al. Study of large deformation construction mechanical behavior and support measures of soft rock in a deep buried extra long tunnel[J]. Journal of Shandong University(Engineering Science), 2011, 41(3):118-125.
[15] 袁勇, 王胜辉. 超大断面低扁平率公路隧洞先成预应力结构新型支护体系数值模拟[J]. 岩土力学, 2008, 29(1):240-244. YUAN Yong, WANG Shenghui. Numerical modeling of pre-built and prestressed innovative support system for super cross-section highway tunnel with lower flat-ratio[J]. Rock and Soil Mechanics, 2008, 29(1):240-244.
[16] 刘新荣,孙翔,蒋树屏,等.四车道公路隧道特点及其所需解决的几个问题[J]. 地下空间, 2003, 23(4):437-439. LIU Xinrong, SUN Xiang, JIANG Shuping, et al. The character of four-lane road tunnel and some problems to be solved[J].Underground Space, 2003, 23(4):437-439.
[17] 宫成兵,张武祥,杨彦民.大断面单洞四车道公路隧道结构设计与施工方案探讨[J].公路, 2004(6):177-182. GONG Chengbing, ZHANG Wuxiang, YANG Yanmin. Discussion on structural design and construction schemes for four-lane section in each separated hole of highway tunnels[J].Highway, 2004(6):177-182.
[18] 王明年,何川. 三车道隧道模型试验研究及有限元分析[J].公路,1995(9):19-28. WANG Mingnian, HE Chuan. Study on model experiment and FEM analysis of three-lane road tunnel[J].Highway, 1995(9):19-28.
[19] 许建聪, 王余富. 水下隧道裂隙围岩渗流控制因素敏感性层次分析[J]. 岩土力学, 2009, 30(6):1917-1925. XU Jiancong, WANG Yufu. Analytic hierarchy process of factor sensitivity on seepage control of underwater tunnel fissured surrounding rock[J]. Rock and Soil Mechanics, 2009, 30(6):1917-1925.
[20] NO S L, NOH S H, LEE S Pm, et al. Construction of long and large twin tube tunnel in Korea-Sapaesan tunnel[J]. Tunnelling and Underground Space Technology, 2006, 21(3/4): 393.
[21] 吴世勇,任旭华,陈祥荣,等. 锦屏二级水电站引水隧洞围岩稳定分析及支护设计[J]. 岩石力学与工程学报, 2005, 24(20): 3777-3782. WU Shiyong, REN Xuhua, CHEN Xiangrong, et al. Stability analysis and supporting design of surrounding rocks of diversion tunnel for Jinping hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(20):3777-3782.
[22] 王明年, 关宝树, 何川. 三车道公路隧道在不同构造应力作用下的力学行为研究[J]. 岩土工程学报, 1998, 20(1):51-55. WANG Mingnian, GUAN Baoshu, HE Chuan. Study on mechanical behavior of three-lane road tunnel under tectonic stresses[J]. Chinese Journal of Geotechnical Engineering, 1998, 20(1):51-55.
[23] 许月,杨文,张宏博.软质岩体中浅埋隧道开挖支护的数值模拟[J].土工基础, 2004, 18(4): 44-47. XU Yue, YANG Wen, ZHANG Hongbo. The data simulation of the shallow underground tunnel excavation in soft rock[J]. Soil Engineering and Foundation, 2004, 18(4):44-47.
[24] 张顶立,王梦恕,高军,等.复杂围岩条件下大跨隧道修建技术研究[J]. 岩石力学与工程学报, 2003, 22(2):290-296. ZHANG Dingli, WANG Mengshu, GAO Jun, et al. Construction technique of large-spanned tunnel under condition of complicated surrounding rocks[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(2):290-296.
[25] 曲海锋. 扁平特大断面隧道修筑及研究概述[J]. 隧道建设, 2009, 29(2):166-171. QU Haifeng. An overview on construction and research of super-large cross-section tunnels with low height-span ratios[J]. Tunnel Construction, 2009, 29(2):166-171.
[26] 万利,李振江,吴涛,等.大跨度小净距黄土隧道关键支护参数研究[J].公路,2016(1):220-224. WAN Li, LI Zhenjiang, WU Tao, et al. Research on the key parameters of the large span and small distance loess tunnel[J]. Highway, 2016(1):220-224.
[1] ZHOU Chenying. Image analysis and engineering application of ground penetrating radar in tunnel lining detection [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2018, 48(4): 61-68.
[2] SONG Guijie. Deformation characteristic and instability analysis for shallow soft rock section during tunnel-entering construction [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2018, 48(2): 53-60.
[3] LIU Jifeng, YANG Huanhuan. Risk control of extremely close twin shield tunnels nearby passing intensive buildings based on informative construction [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(3): 102-111.
[4] BAI Xianjun, WANG Taixing, WEI Xin, ZHAO Wusheng. Effect of the velocity pulse on the seismic response of the tunnel [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(2): 14-19.
[5] ZHOU Lun, LI Shucai, XU Zhenhao, LI Liping, HUANG Xin, HE Shujiang, LI Guohao. Integrated advanced geological prediction technology of tunnel and its engineering application [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2017, 47(2): 55-62.
[6] BAO Jianye, WANG Jing. Prediction of flow rate during tunnel excavation based on discrete fracture network models [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2016, 46(6): 127-134.
[7] SUN Keguo, QIU Wenge, WANG Zhongping, GAO Xiaoyan, GONG Lun, KONG Chao. Study on approaching excavation influence between expanding projects of expressway and high speed railway tunnel under operation state [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2015, 45(5): 70-76.
[8] GAO Zhijun, CUI Xinzhuang, SUI Wei, GUO Hong, LIU Hang, LI Changyi, FENG Hongbo. Dynamic interaction and damage analysis of large runaway vehicle and tunnel lining [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2014, 44(5): 49-57.
[9] ZHOU Qian, ZHAO Degang. Application of the horizontal jet grouting pile in water-bearing sandy layer of shallow excavating tunnel [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2014, 44(4): 52-57.
[10] ZHOU Luan-ai1, TANG Wen-zuo2, CUI Xiao-hua3, SUI Hui-bin4*. null [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(6): 83-88.
[11] L Guo-ren1, SUI Bin2, WANG Yong-jin1, WU Jian-quan3. Study on numerical simulation and stability analysis shallow buried tunnel excavation under unsymmetrical  pressure [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(4): 68-73.
[12] WEI Yi 1, SHEN Ji-zhong 2. Design methodology of ternary logic circuit on resonant tunneling diode [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(3): 94-98.
[13] SUN Huai-feng1, LI Shu-cai1, LI Xiu2, QI Zhi-peng2, LIU Lei2, XUE Yi-guo1, SU Mao-xin1, LIU Bin1, ZHANG Wen-jun1. Feasibility of using magnetic resonance sounding in prediction of water bearing structures in front of a tunnel face [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2013, 43(1): 92-97.
[14] Lü Guo-ren1, ZHANG Shou-long2. Research on advanced prediction and surrounding rock stability of shallow buried and unsymmetrical loaded section in tunnel excavation [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2012, 42(5): 102-107.
[15] LI Shu-chen1, XU Qin-jian1, FENG Xian-da1, HU Shi-quan2, ZHOU Qiang2. Study on the classifications of surrounding rock and the support measures of the expansive soil tunnels [J]. JOURNAL OF SHANDONG UNIVERSITY (ENGINEERING SCIENCE), 2012, 42(4): 79-85.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!