Journal of Shandong University(Engineering Science) ›› 2022, Vol. 52 ›› Issue (4): 175-182.doi: 10.6040/j.issn.1672-3961.0.2021.335

Previous Articles    

Mechanical mechanism of construction of new shield tunnel under existing structure

ZHU Bin1, WANG Jian1, XU Zhuang1, LUO Xiaogang1, MENG Dong1, XING Zhihao2, ZHANG Zheng2, WU Ke2   

  1. 1. Shenzhen Metro Construction Group Co., Ltd., Shenzhen 518026, Guangdong, China;
    2. School of Civil Engineering, Shandong University, Jinan 250061, Shandong, China
  • Published:2022-08-24

CLC Number: 

  • U455.4
[1] 徐飞. 城轨隧道盾构施工对周边环境的影响研究[D]. 北京:北京交通大学, 2011. XU Fei. The study of the peripheral environment influence by TBM construction under urban rail traffic[D]. Beijing: Beijing Jiaotong University, 2011.
[2] 黄明利,伍志勇,徐飞. 城市环境下盾构施工对周边环境影响的监测与分析[C] //第一次学术研讨会暨中铁隧道集团城市盾构项目管理、施工技术、设备维保交流会论文集. [S.l.] : 中国土木工程学会. 2011:32-49. HUANG Mingli, WU Zhiyong, XU Fei. Monitoring and analysis of the impact of shield construction on the surrounding environment in urban environment[C] //Proceedings of the first academic seminar of the Exchange Meeting on Urban Shield Project Management. [S.l.] : China Civil Engineering Society, 2011:32-49.
[3] 田皓文. TBM施工对地面建筑物振动影响分析[J]. 山西建筑, 2012, 38(34):192-194. TIAN Haowen. Influential analysis on TBM construction upon ground building vibration[J]. Shanxi Architecture, 2012, 38(34): 192-194.
[4] 林存刚,吴世明,张忠苗, 等. 盾构掘进速度及非正常停机对地面沉降的影响[J]. 岩土力学, 2012, 33(8):2472-2482. LIN Cungang, WU Shiming, ZHANG Zhongmiao, et al. Influences of shield advance rate and abnormal machine halt on tunnelling-induced ground surface settlements[J]. Rock and Soil Mechanics, 2012, 33(8):2472-2482.
[5] 郑刚, 路平, 曹剑然. 基于盾构机掘进参数对地表沉降影响敏感度的风险分析[J]. 岩石力学与工程学报, 2015(增刊1): 3604-3612. ZHENG Gang, LU Ping, CAO Jianran. Risk analysis based on the parameters sensitivity analysis for ground settlement induced by shield tunneling[J]. Chinese Journal of Rock Mechanics and Engineering, 2015(Suppl.1):3604-3612.
[6] 蔡兵华, 冯晓腊, 李忠超, 等. 小型土压平衡盾构隧道掘进参数研究[J]. 安全与环境工程,2020,27(2):204-209. CAI Binghua, FENG Xiaola, LI Zhongchao, et al. Study on the tunneling parameters for small-scale earth pressure balance shield tunneling[J]. Safety and Environmental Engineering, 2020, 27(2):204-209.
[7] 纪梅,谢雄耀. 大直径土压平衡盾构掘进引起的地表沉降分析[J]. 地下空间与工程学报,2012,8(1):161-166. JI Mei, XIE Xiongyao. Numerical simulation analysis of ground surface settlement caused by large diameter EPB shield tunneling[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(1):161-166.
[8] PIRASTEHFAR K, SHIVAEI S, SADAGHIANI M H, et al. 3D numerical investigation of the effects of driving of the new mechanized tunnel on existing segmental linings and ground surface settlements-a case study: Shiraz metro line 2[J]. International Journal of Geotechnical Engineering, 2020:1-12.
[9] ZHANG K, YU H, LIU Z, et al. Dynamic characteristic analysis of TBM tunnelling in mixed-face conditions[J]. Simulation Modelling Practice & Theory, 2010, 18(7):1019-1031.
[10] 贾小伟. 盾构地铁开挖对邻近建筑物桩基影响的数值分析[D]. 烟台:鲁东大学,2018. JIA Xiaowei. Numerical analysis of influence of shield tunneling excavation on pile foundations of adjacent buildings[D]. Yantai: Ludong University, 2018.
[11] 杨龙. 城市地铁隧道TBM法施工引起地层振动和地面沉降分析[D]. 上海:上海交通大学,2013. YANG Long. Analysis of vibration effect and surface settlement induced by TBM excavating subway tunnel in urban area[D]. Shanghai: Shanghai Jiao Tong University, 2013.
[12] 王璐. 西安市地铁区间隧道盾构施工对地表沉降机理的研究[D].西安: 西安科技大学, 2008. WANG Lu. Study on the mechanism of ground surface settlement induced by shield construction in Xi'an[D]. Xi'an: Xi'an University of Science and Technol-ogy, 2008.
[13] 高玮,杜家庆,杨龙. 地铁隧道TBM施工振动对周边环境影响的数值分析[J]. 路基工程, 2015(1):100-103. GAO Wei, DU Jiaqing, YANG Long. Numerical analysis on impact of vibration on surrounding environment in TBM construction of subway tunnel[J]. Subgrade Engineering, 2015(1):100-103.
[14] 严鹏, 卢文波, 陈明,等. TBM和钻爆开挖条件下隧洞围岩损伤特性研究[J]. 土木工程学报, 2009, 42(11):121-128. YAN Peng, LU Wenbo, CHEN Ming, et al. Study of the damage characteristics of surrounding rocks for tunnels constructed using TBM and drill-and-blast[J]. China Civil Engineering Journal, 2009, 42(11):121-128.
[15] 施成华, 彭立敏. 随机介质理论在盾构法隧道纵向地表沉降预测中的应用[J]. 岩土力学, 2004, 25(2):320-323. SHI Chenghua, PENG Limin. Application of stochastic medium theory to predicting settlement in longitudinal surface due to tunnel construction by shield[J]. Rock and Soil Mechanics, 2004, 25(2):320-323.
[16] 秦亚斌,朱大勇,张振华,等. 盾构下穿大型立交时掘进速度对桩基及地表沉降的影响[J]. 城市轨道交通研究, 2018,21(4):103-108. QIN Yabin, ZHU Dayong, ZHANG Zhenhua, et al. Effect of shield advance speed on the tunnel under-crossing large flyover pile foundation and subsidence[J]. Urban Mass Transit, 2018, 21(4):103-108.
[17] 刘仁鹏. 盾构选型[J]. 建筑机械, 2004(9):58-59. LIU Renpeng. Shield selection[J]. Construction Machinery, 2004(9):58-59.
No related articles found!